Odyssey Gold Limited announced progress results from the Highway Zone on the Company's Tuckanarra Project. Odyssey's Tuckanarra Project is part of the prolific Murchison Goldfields. The Murchison Goldfields are host to a +35Moz gold endowment (historic production plus current resources) with 7.5Mtpa of processing capacity within 120km of the Tuckanarra Project.

Odyssey's 2022 reverse circulation ("RC") drilling campaign has identified a mineralised shoot with significant scale potential. The first hole at the Highway Zone was drilled in late 2021 with a result of 2021 of 7m @ 2.5g/t Au, 14m @ 1.9g/t and 5m @ 2.2g/t Au in TCKRC0101v at the Highway Zone. Subsequent drilling in 2022 has defined a 10-20m true width structure with a 300m long mineralised shoot.

A 19 hole, 2,300m program is underway. The first results returned include CBRC0148 targeting oxide mineralisation above the high-grade shoot. CBRC0148 intersected 20m @ 2.1g/t Au from 42m.

This hole continues to demonstrate a consistent 15-20m thick oxide gold horizon above the sulphide mineralisation that extends to depth. Two lines of drilling have been completed targeting structure in oxide 160m to the east. CBRC0132 drilled a 40m wide zone of oxide mineralisation associated with quartz veining in oxidised ultramafic and sediments.