Odyssey Gold Limited announced that reverse circulation ("RC") drilling has commenced into the high-grade mineralised shoot at Highway Zone on the Company's Tuckanarra Project. Odyssey's Tuckanarra Project is part of the prolific Murchison Goldfields. The Murchison Goldfields are host to a +35Moz gold endowment (historic production plus current resources) with 7.5Mtpa of processing capacity within 120km of the Tuckanarra Project.

Odyssey's 2022 RC drilling campaign has identified a mineralised shoot with significant scale potential. The first hole at the Highway Zone was drilled in late 2021 with a result of 7m @ 2.5g/t Au, 14m @ 1.9g/t and 5m @ 2.2g/t Au in TCKRC0101iv at the Highway Zone. Subsequent drilling in 2022 has defined a 10-20m true width structure with a 300m long mineralised shoot.

The emerging high-grade shoot with several > 50 gram metres demonstrates strong underground potential. Extensive shallow oxide mineralisation also supports potential open pit development - intersections starting at 9m below surface and up to 84m wide in oxide.