NTM Gold Ltd. provided a drilling update for the Hub deposit, within the Redcliffe Gold Project located near Leonora, Western Australia. The latest extensional diamond holes have extended the high-grade mineralisation by a further 190m to the south, and 100m vertically, returning: 5.5m at 11.7 g/t Au from 529m, incl. 2.0m at 23.6 g/t Au in 20RDD006 and 2.0m at 5.1 g/t Au from 543.7m in 20RDD005. These follow on from previous results (See ASX 1/9/2020, 21/9/2020) which intersected: 7.5m at 8.1 g/t Au from 405.6m, incl. 4.4m at 12.2 g/t Au in 20RDD004 and 6.5m at 7.0 g/t Au from 459m, incl. 2.5m at 12.2 g/t Au in 20RDD003. Holes 20RDD003, 004 & 005 are all on the same northing and indicate the high-grade mineralisation has a vertical continuity of over 160m, and is open both up and down dip and along strike. The high-grade mineralisation south of the Lamprophyre intrusive now extends to almost 300m in length, remaining open down plunge and along strike to the south. A diamond tail on a previous RC hole, 191RC107D, was designed to test the mineralisation at shallower depths. The hole intercepted modest grades and widths, returning 1.0m at 1.8 g/t Au from 186m and 1.0m at 1.1 g/t Au from 295m.