Millennium Minerals Limited has received initial assay results from the extensive new program of resource in-fill and extensional drilling which commenced last year from underground drilling platforms at the Bartons deposit, part of its 100%-owned Nullagine Gold Project in Western Australia. The drilling program was designed to in-fill deeper portions of the Mineral Resources and allow conversion of the next five development levels to Ore Reserves. With the underground resource remaining open at depth, the drilling also tested for extensions of the deposit to a depth of 200m below the previously defined Mineral Resources. The drilling program was highly successful, returning a number of significant high-grade intercepts well beyond the interpreted boundary of the mineralisation, which shows the location of the drill holes. Significant results received to date from the drilling are shown below. True widths (TW) are shown in brackets after the down-hole interval: 3.32m (2.9m TW) @ 14.09g/t Au from 151.4m including 2.72m (2.4m TW) @ 16.62g/t Au from 152m (BUDD0001); 8.1m (3.8m TW) @ 5.23g/t Au from 213.9m including 2.4m (1.1m TW) @ 9.23g/t Au from 216.6m (BUDD0020); 8m (3.6m TW) @ 3.69g/t Au from 95m including 1.15m (0.5m TW) @ 13.55g/t Au from 100m (BUDD0011A); 6m (3.1m TW) @ 6.71g/t Au from 147m including 5m (2.6m TW) @ 7.59g/t Au from 147m (BUDD0021); 6.6m (3.0m TW) @ 3.14g/t Au from 111m including 1m (0.4m TW) @ 10.85g/t Au from 114.4m (BUDD0003); 5.3m (2.7 m) @ 2.90g/t Au from 115.7m including 1.19m (0.6m TW) @ 5.62g/t Au from 118.56m (BUDD0005); 2.67m (1.6m TW) @ 4.92g/t Au from 64.73m including 1m (0.8m TW) @ 6.82g/t Au from 66.4m (BUDD0026); 3.2m (1.4m TW) @ 4.00g/t Au from 143.6m including 0.95m (0.4m TW) @ 6.45g/t Au from 145.85m (BUDD0032); 6m (1.9m TW) @ 2.58g/t Au from 141m (BUDD0007); 6m (1.4m TW) @ 3.48g/t Au from 145m (BUDD0008); 3.35m (1.6m TW) @ 3.27g/t Au from 159.65m including 1m (0.5m TW) @ 5.17g/t Au from 161m (BUDD0018); and 4m (1.8m TW) @ 2.69g/t Au from 128m including 1m (0.5m TW) @ 5.50g/t Au from 128m (BUDD0022). Importantly, the drilling has also identified additional extensional drill targets which will be tested during the next round of underground drilling at Bartons. These targets have the potential to further significantly expand the underground mine at depth below the current workings. Underground development is continuing on the 225 level at Bartons and development has commenced on the 210 level.