PRESS RELEASE

23 January 2017

NEW SOLAR AND HYBRID POWER EPC CONTRACTS FOR METKA EGN

METKA is pleased to announce that its 50.1% owned subsidiary company, METKA EGN, has recently signed contracts to provide turn-key engineering, procurement and construction (EPC) for projects with a total capacity of 75MW and contract value exceeding Euro 60 million.

The largest of the new contracts is with Noriker Power Limited to provide an innovative 20MW power plant, including a large battery storage installation, which will provide fast frequency response services for the UK's electricity network. This builds on the experience gained through the successful implementation of the Oriana project in Puerto Rico for Sonnedix, representing one of the world's largest solar PV power plants with battery storage integration.

The majority of the other projects concern solar photovoltaic (PV) power plants in the United Kingdom, six of which are with Lightsource and Canadian Solar, both existing clients.

About METKA

METKA, part of the Mytilineos Group, is a leading international contractor and industrial manufacturing company. The company provides the complete range of Engineering- Procurement-Construction (EPC) scope for energy and infrastructure projects, and has a significant industrial base for high value-added metal construction applications. Beyond its core strengths in EPC and manufacturing, METKA leverages the industry expertise and financial capacity of the Mytilineos Group to provide financing and life-cycle solutions for critical power projects internationally. Further information is available at: www.metka.com.

About METKA EGN

METKA EGN is a joint venture between METKA and the EGNATIA Group, focused on utility scale projects for the global solar power market. The company serves major international clients primarily in the markets of Europe, Middle East, Africa and Latin America. Further information is available at www.metka-egn.com.

Press Contact

Ms Antigoni Fakou: MYTILINEOS Group Press Office

Tel. +30 210-6877346 | Fax +30 210-6877400 | E-mail Antigoni.Fakou@mytilineos.gr.

Metka SA published this content on 23 January 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 23 January 2017 10:45:08 UTC.

Original documenthttp://www.metka.com/Uploads/ANNOUNCEMENTS/2017/METKA_PRESS_RELEASE_23012017_EN.pdf

Public permalinkhttp://www.publicnow.com/view/EB1D3428A15DA80D76DAC3BA99FD92EBFDFAD3FA