TRENCHING COMPLETED AT THE BABICHO GOLD PROJECT

HIGHLIGHTS

only

Babicho Gold Project's second phase trenching program has been completed

Trenching results confirm >3km of continuous mineralisation along strike at the Roba

Shakiso prospect (details below)

Trenching results returned indicate broad gold mineralisation:

use

o BBTR025: 1m @ 13.75g/t Au (within 4m @ 3.67g/t Au)

o BBTR018: 4m @ 1.67g/t Au (within 21m @ 0.63g/t Au)

o BBTR017: 1m @ 2.44g/t Au (within 24m

@ 0.32g/t Au) & 1m @ 1.25g/t Au

o BBTR019: 1m @ 2.39g/t Au (within 21m

@ 0.31g/t Au)

o BBTR021: 2m @ 1.54g/t Au (within 12m

@ 0.42g/t Au)

o BBTR035: 1m @ 2.10g/t Au (within 15m

@ 0.55g/t Au)

personal Geological observations from drill holes and trenching indicate similar alteration and mineralisation to that observed at nearby Lega Dembi and Sakaro deposits (>3Moz Au)

Quartz veining with visible sulphides (pyrite) up to 7m wide within broad alteration zones 20-30m wide observed across trenching and drilling programs thus far

Trenching proximal to peak drilling result BBDD001 which ran 4.1m @ 1.97g/t Au (within 11m @ 0.79g/t Au) from 98m under trench BBTR001 (11.1m @ 3.21g/t Au) (previously announced)

Ethiopian-focused gold explorer Megado Gold (ASX:MEG) (Megado or the Company) is pleased to provide updates from the Company's Babicho Gold Project (Figure 2), located in the Adola Gold Belt in Ethiopia.

Megado Gold CEO and Managing Director, Michael Gumbley, commented:

For

"A strike length exceeding 3km is a strong indication of the Babicho Gold Project's potential. This surpasses

that of Lega Dembi, which has produced >3Moz gold. Throughout Babicho's trenching and drilling programs,

wide zones of quartz veining upwards of 10-20m have been consistently intersected. There is another four

kilometres along the Silingo Shear - in areas of known artisanal activity - yet to be tested. These results and

Babicho's evident potential bode well for future exploration."

Megado Gold Ltd

Australian Registered Address

Directors

ACN 635 895 082

12/197 St Georges Terrace

Brad Drabsch (Non-Exec. Chair)

ASX: MEG

PERTH WA 6000 Australia

Michael Gumbley (MD and CEO)

Issued Capital

Chris Bowden (Exec. Tech. Director)

T +61 8 6141 3260

Marta Ortiz (Non-Exec. Director)

71.5m Shares

Aaron Bertolatti (Finance Director)

16.3m Options

E info@megadogold.com

W www.megadogold.com

For personal use only

Figure 1 - Phase 2 trenching results at the Babicho Gold Project

Trenching Results at the Babicho Gold Project

Megado's trenching at the Babicho Gold Project has thus far produced results indicative of a system capable

only

of hosting gold deposits of significant size (see Table 1). Encouraging for the Company is that these recent

trenching results reflect broad gold mineralisation. Notably,

this and previous trenching and drilling

programs, have intersected wide zones of quartz veining upwards of 10-20m consistently intersected along

a strike length which now exceeds 3km (see Figure 1).

Table 1 - Significant Intercepts from trenching program at the Roba Shakisso Prospect, Babicho Gold Project

use

Trench ID

From (m)

To (m)

Width (m)

Au (g/t)

BBTR002

44

74

30

1.27

inc.

59

70.1

11.1

3.21

BBTR005

89

93

4

0.31

BBTR006

93

104

11

0.12

and ^

130

143

13

0.19

BBTR007

23.2

31

7.8

0.41

personal

BBTR009

46

62

16

0.11

BBTR010

2

8

6

0.30

and

37

38

1

2.09

BBTR011

55

85

30

0.84

inc.

71

81

10

2.04

BBTR012

70

91

21

1.46

inc.

80

91

11

2.55

and

45

51

6

1.75

BBTR013

70

74

4

0.83

BBTR014

75

82

7

0.41

97

107

10

0.48

BBTR015

123

137

14

1.09

inc.

123

129

6

2.13

BBTR016

72

102

30

1.06

inc.

96

102

6

3.03

BBTR017

34

48

14

0.20

For

BBTR017

61

71

10

0.23

BBTR017

87

111

24

0.32

inc.

102

103

1

2.44

BBTR018

22

43

21

0.63

inc.

38

42

4

1.67

BBTR019

31

52

21

0.31

inc.

41

42

1

2.39

BBTR020

27

48

21

0.28

BBTR021

94

106

12

0.42

inc.

103

105

2

1.54

BBTR023

54

63

9

0.59

BBTR025

71

75

4

3.67

only

inc.

72

73

1

13.75

BBTR027

108

132

24

0.19

BBTR035

8

23

15

0.55

inc.

21

22

1

2.10

BBTR036

30

40

10

0.34

BBTR037

6

20

14

0.19

^ BBTR006: 143m end of trench, intercept ends in mineralisation - 1m @ 0.61g/t Au

All reported widths are downhole/along trench and are not necessarily indicative of true widths.

usepersonalFigure 2- Babicho Gold Project Overview. Silingo Shear in centre (coincident with soil anomaly), Biloya Shear to east - both part of the tenement scale Babicho Shear Zone, of which is part of the belt-wide Lega Dembi-Sakaro shear zone.

ForResults of all trenching and drilling (see Table 2, and Appendices 1 & 2) at Babicho have demonstrated broad mineralisation. In particular, Megado's geologists have noted wide zones of sericite altered, meta- granodiorite, hosting quartz veining with heavily oxidised sulphides (pyrite). This is noteworthy because it compares favourably to that of the attributes noted in the lithology, alteration, and mineralisation of Lega Dembi and Sakaro which have produced >3Moz Au and are situated 50km along strike to the south. As an example, the gold mineralisation from hole BBDD001 (11m @ 0.79g/t Au, from 98m) is located within intervals of highly silicified schist (from 101m to 120m) hosting quartz veins with pyrite (3%) and chalcopyrite (<1%), similar to Lega Dembi. This result at BBDD001 also showed a strong indication of a mineralised zone dipping moderately east and plunging to the north.

Table 2 - Significant Intercepts from initial drilling program at the Roba Shakisso Prospect, Babicho Gold Project

only

Drillhole ID

From (m)

To (m)

Depth (m)

Au (g/t)

BBDD001

98

109

11

0.79

and

137

145

8

0.44

inc.

100.9

105

4.1

1.97

BBDD002

131.2

141.2

10

0.24

BBDD003

46.5

56

9.5

0.14

BBDD004

96

111

15

0.33

BBDD005

26.4

28

1.6

0.43

All reported widths are downhole and are not necessarily indicative of true widths.

Ongoing Activities at the Babicho Gold Project

In view of the strong trenching results, broad mineralisation, and Lega Dembi similarities, Megado remains

confident of Babicho's potential. Future work will test the greater than 3km of strike and the depth

extensions at the Roba Shakiso Prospect.

personaluse

For

Figure 3 - Overview of Phase 2 trenching at the Babicho Gold Project

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Megado Gold Ltd. published this content on 16 February 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 16 February 2022 22:33:02 UTC.