McPhy: contract for four electrolysers in Germany
The contract is structured in two stages, with the first stage comprising the supply of a McLyzer 3200-30, with a capacity of 16 MW, to be commissioned at the end of 2025. The second stage comprises three additional McLyzer 3200-30s, to be commissioned in 2027.
These electrolysers will be powered by electricity from a wind farm and photovoltaic plants located near the station, and will produce up to 10,000 tonnes of low-carbon hydrogen per year.
Copyright (c) 2023 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction