3 January 2014

ASX Announcement Grace?1 Exploration Well in WA?314?P Progress Report No 7


Since the 20th December 2013 Grace?1 progress report, in addition to completing scheduled Blowout Preventer (BOP) testing, the rig was required to be evacuated as a result of tropical cyclone Christine passing near the Grace?1 location.
The rig is currently being remanned and no damage appears to have been sustained during the tropical cyclone. Preparations are underway to resume drilling in the 6?1/2"hole section as soon as practicable.
As at 0600 WDT on 3 January, the well depth is 4,767 metres. The current hole section is expected to contain the primary Lower Plover formation target.
Grace?1 is the fourth well in the current exploration program, located in permit WA?314?P on a separate structural trend to the previously announced Greater Poseidon gas discoveries. The well is located in a crestal position on a large fault block approximately 35 kilometres north of the Poseidon field.
ConocoPhillips is the operator of the jointly held WA?314?P Browse Basin permit in which Karoon
Gas Australia Ltd holds 90%.
The Transocean Legend semi?submersible rig is drilling the exploration well.

Upcoming Well Program

The exploration program, operated by ConocoPhillips, plans to utilise the Transocean Legend semi?
submersible rig for the entire campaign and is expected to continue through 2014.
A minimum of six wells will be drilled during the exploration program, with three drilled to date. The principal objective of the forward exploration program is to better define the size and quality of the hydrocarbon accumulations within the exploration permits which contain the greater Poseidon trend.
Following the completion of the Grace?1 well and prior to spudding the next well, Poseidon North?1, the Transocean Legend has a one month maintenance period to complete.
Poseidon North?1 is the fifth well in the program, located 6.5 km north east of Poseidon?1. The well is located in a crestal position on a large tilted fault block with the primary target being the Plover Formation. The secondary target is the Montara Formation.
Additional well locations for the remainder of the program will be announced as they obtain joint venture approval.

Karoon Gas Australia Ltd ABN 53 107 001 338

Head Office: PO Box 469 Mt Martha Victoria 3934 ?T: +613 5974 1044 F: +613 5974 1644

Technical Office: 25/367 Collins Street Melbourne Victoria 3000 ?T: +613 9616 7500 F: +613 9640 0406

Website: www.karoongas.com.au

Ongoing progress reports

In addition to complying with its continuous disclosure obligations, Karoon proposes to provide fortnightly progress reports during drilling operations.

For further information please see the Karoon website or contact:



Scott Hosking Company Secretary James Wootton Investor Relations
T: +613 5974 1044 T: +613 9616 7520
E: shosking@karoongas.com.auE: jwootton@karoongas.com.au
Ian Howarth Collins Street Media
T: +614 0782 2319
E: ian@collinsstreetmedia.com.au

Karoon Gas Australia Ltd ABN 53 107 001 338

Head Office: PO Box 469 Mt Martha Victoria 3934 ?T: +613 5974 1044 F: +613 5974 1644

Technical Office: 25/367 Collins Street Melbourne Victoria 3000 ?T: +613 9616 7500 F: +613 9640 0406

Website: www.karoongas.com.au

distributed by