The drill programme is expected to be completed over a period of approximately 6 weeks by leading RC drilling contractor
The 6,000m RC drill programme will drill test the following
Down plunge and strike extension of the high?grade shoot with grades of 12m @ 12.01 g/t including 3m @ 35.87g/t Au located south of the
Down dip and along strike extensions of the significant widths of gold mineralisation such as 20m @ 2.22g/t Au that have been intersected 350m north of the
Down dip extensions of gold mineralisation below the shallow
A total of 40 drill holes have been planned. The majority of the holes range in depth from 100 to 250m.
Victory expects to provide regular news flow as the drilling programme progresses, with results to be released when they become available.
ABOUT THE COOGEE GOLD PROJECT
The project's location near the major mining centre of Kalgoorlie in
ABOUT GOLD MINERALISATION
High grade gold mineralisation has been observed to be associated with coarse grained pyrite (1?5mm grains). The grains of pyrite generally form in clusters proximal to strong magnetite- chlorite alteration which is the highest?grade alteration that is associated with the gold mineralisation. More distal alteration is made up of hematite-chlorite assemblage, with or without sericite, the broader alteration pattern comprises epidote within a medium to coarse grained dacite and finer grained andesite/rhyolite rock types. The style of gold mineralisation is thought to represent a skarn?like assemblage.
Gold mineralisation at
Contact:
Tel: +61 419 944 396
(C) 2021 Electronic News Publishing, source