Inventus Mining Corp. provided an exploration update for its 100%-owned Sudbury 2.0 and Pardo Projects. Sudbury 2.0: At the Cobalt Hill gold-cobalt-nickel target, a total of 7 diamond drill holes for 2,700-metres of drilling have been completed.

The drilling so far has intersected the target sulphide breccia in 6 of 7 holes and has demonstrated an extensive alteration system extending past 500 metres depth. The drilling program was designed to test the geophysical anomalies generated in 2021 and explore the mineralized sulphide breccia around hole CH-21-02 that intersected 7 metres of 4.4 g/t gold, 0.09% cobalt and 0.03% nickel within a larger mineralized interval of 44 metres of 1.3 g/t gold. The most interesting samples to date are from holes 5A, 6 and 7, which are all step-outs designed to target the mineralized sulphide breccia around CH-21-02.

All holes intersected the zone with significant intervals of 110 m (hole 5A), 77 m (hole 6) and 68 m (hole 7). CH-22-04 (dip -70) – Intersected a quartz breccia unit from 329 to 365 m (36-m interval) and a 195 m quartz chlorite breccia unit from 365 to 560 m (195-m interval) down hole. The large quartz chlorite breccia unit represents a significant geological event likely related to the emplacement of the mineralized sulphide breccia.

Assays are pending on 187 samples. CH-22-05A (dip -62) – The hole was drilled 40 m west of CH-21-02 and intersected sulphide breccia from 200 to 310 m (110-m interval) followed by alteration with disseminated and stringer-type sulphide from 310 to 537 m (220-m interval). The sulphide breccia unit contained on average 15% sulphide, while the disseminated and stringer-type contained 3% on average.

Preliminary assays on rushed samples have returned up to 7.7 g/t gold, 0.34% cobalt and 0.15% nickel. CH-22-06(dip -55)– Intersected two zones of sulphide breccia above and east of CH-22-05A. A zone from 70 to 94 m (24-m interval) and a zone from 160 to 237 m (77-m interval) representing the up-dip extent of sulphide breccia in CH-22-05A.

The breccia contained on average 12% sulphide. The hole is currently being logged and sampled. CH-22-07(dip -60)– Intersected the sulphide breccia unit from 225 to 293 m (68-m interval).

The hole was designed to intersect the sulphide breccia perpendicular to the intersections in CH-22-05A and CH-22-06 to provide information on the extent and geometry of the unit. The hole is currently being logged and sampled.