Phase 2 drilling completed in May included 70 holes for 778m (refer ASX releases dated 18 March and
The C20 stockpile is understood to be a low grade rehandle stockpile created during the gold only CIP operations phase in the mid to late 1980's. During the subsequent 'Chalcocite' Direct Shipped Ore ('DSO') mining phase, the surface of this stockpile was used a resample area for high grade ore excavated from the margins of the DSO orebody that may have been diluted during mining.
Copper-Gold Materials Discussion
C20 Stockpile The C20 stockpile is understood to be a low grade rehandle stockpile created during the gold only CIP operations phase in the mid to late 1980's. During the subsequent 'Chalcocite' Direct Shipped Ore ('DSO') mining phase, the surface of this stockpile was used a resample area for high grade ore excavated from the margins of the DSO orebody that may have been diluted during mining.