Gold Standard Ventures Corp. announced assay results of ten reverse-circulation (RC) holes from the southeast portion of the Pinion Phase 2 drilling program at its 100%-owned Railroad- Pinion Project on Nevada's Carlin Trend. All ten holes returned significant intercepts with gold values well above the 0.14 grams per tonne (g Au/t) cut-off grade established by APEX Geoscience Ltd. of Edmonton, Canada in its NI 43-101 resource estimate announced on September 10, 2014, with intercepts up to 48.8 meters of 1.16 g Au/t in hole PIN14-38.

Phase 2 drilling was designed to extend areas of known shallow oxide gold mineralization along strike and at depth, and to test new targets identified by the Phase 1 program. Phase 2 (now completed) included 10,893 m of RC drilling in 44 holes. Assays are pending for a further 19 holes including PIN14-24, -29, -32, -35, -39, -41, -43 through -46, -48, -49, and -51 through -57.