Getty Copper Inc. announced the completion of its 2021 exploration program. During the Fall of 2021, Getty conducted a property scale Airborne MobileMT survey including total field magnetic and VLF was also carried out covering some 1300-line kilometer using a state-of-the-art airborne magnetometer system developed by EGL. The results of both surveys are currently pending and will be reported once received. Getty Copper also collected some 193 samples from lodgepole pine bark on 250 m grid centers, covering a broad geophysical trend extending to the north and west of the Getty North Deposit in an attempt to identify zones of mineralization beneath the glacial till. In addition to the property scale exploration work, a detailed relogging of a select group of drill holes through the core of the Getty North deposit was undertaken to improve on and constrain the current alteration modelling to aid in vectoring of additional deep drill holes. This included, systematic terraspec, magnetic susceptibility and portable X-ray fluorescence analysis. The results of the 2021 program will be used to help guide a drilling program which is slated for the spring of 2022 pending the approval of a drill permit along with additional work to be conducted during the 2022 field season. The drill program is designed to verify and expand historical resource calculations on the property.