On May 27, MV. DA CHANG, owned by COSCO SHIPPING, successfully loaded 85000 CBM wind power equipment in DA FENG Port, which reached the highest wind power equipment load record of heavy lift vessel and multipurpose vessel in the world.

Wind blades were loaded in five layouts over 15 meters high. The company paid high attentions to complete this loading operation. Specifically, American Shipping Line carefully deployed the vessel for the mission, while technical center studied the stowage plan more than once. Besides, COSCO SHIPPING marketing team leader visited the field to monitor the loading operation and carry out customer marketing,and Port captain carefully instructed ship crews with their coordination to complete this Ultra Records wind power transport mission on loading site, which again reveals COSCO SHIPPING's exquisite freight transport techniques and excellent vessel stowage capacity that is highly praised by the customers.

Cosco Shipping Company Limited published this content on 06 June 2016 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 06 June 2016 06:39:06 UTC.

Original documenthttp://www.coscol.com.cn/En/News/detail.aspx?ID=11006

Public permalinkhttp://www.publicnow.com/view/D4C9A60D5259A9F1F6D3DAEDF3C64FEDBDECD5E8