CONSENT OF QUALIFIED PERSON
I, Harold Harkonen, P. Eng. consent to the public filing of the technical report titled "NI 43-101 Technical Report and Prefeasibility Study for the San Matías Copper-Gold-Silver Project, Colombia" with an effective date of January 11, 2022 (the "Technical Report") by Cordoba Minerals Corp. (the "Issuer").
I also consent to the use of any extracts from or a summary of the Technical Report in the Press Release of Cordoba Minerals dated January 11, 2022 (the "Press Release").
I certify that I have read the Press Release as filed by Cordoba Mineral Corp. and that it fairly and accurately represents the information in the sections of the Technical Report for which I am responsible.
Dated this 11th day of January 2022.
_ ___________________
Harold Harkonen, P. Eng.
Consulting Specialist - Power Systems
Nordmin Engineering Ltd.
ESSI | O | ||||||||||||||
F | |||||||||||||||
O | N | ||||||||||||||
A | |||||||||||||||
R | L | ||||||||||||||
P | |||||||||||||||
D | E | ||||||||||||||
N | |||||||||||||||
S | E | ||||||||||||||
N | |||||||||||||||
N | G | ||||||||||||||
E | |||||||||||||||
E | I | ||||||||||||||
C | E | ||||||||||||||
I | |||||||||||||||
L | H. E. HARKONEN | R | |||||||||||||
P | 11-Jan-2022 | IO | |||||||||||||
R | |||||||||||||||
O | R | ||||||||||||||
V | |||||||||||||||
A | |||||||||||||||
I | T | ||||||||||||||
N | CE | N | |||||||||||||
OF O |
NORDMIN ENGINEERING LTD. | 160 Logan Avenue, Thunder Bay, ON, P7A 6R1 | T: 807.683.1730 F: 807.683.1744 | www.nordmin.com
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Cordoba Minerals Corp. published this content on 12 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 12 January 2022 18:35:03 UTC.