Continental Gold Inc. announced positive gold reconciliation results from approximately 600 tonnes of recently extracted trial mining test ore that the Company batch-processed through its 30-tonne per day Yaraguá mill located at the Buriticá project, Antioquia, Colombia. Two vertically-stacked stopes located along the HW vein in the Yaraguá system, at a midpoint elevation of 1,525 RL measuring 20 metres along strike by 35 metres vertically by 2.60 metres wide, were mined using the mechanized long-hole method. All ore extracted from the stopes was systematically and thoroughly muck sampled and assayed, with final results significantly better than the current mineral resource block model estimate on grade, tonnes and ounces. A total of 594 tonnes of ore, recovered from the western portion of both the upper and lower stopes, was initially muck sampled and then batch processed through the Company's 30-tonne per day Yaraguá mill. The mill results have been reconciled with both the mineral resource estimate block model and subsequent muck sampling results.