CECO Environmental Corp. announced that the company's energy business has been awarded a large contract to provide a CECO Peerless SCR Exhaust System for what will be the simple-cycle natural gas-fired turbine ever built in the US. The contract includes custom engineering, analysis, design and modeling as well as sound acoustics, performance and construction of the exhaust system to meet the project specifications. The SCR exhaust system is a mission-critical equipment in a gas-fired power plant as it: Provides both emission and sound control to meet industry and environmental requirements; Reduces NOx and CO and VOC levels in the turbine exhaust gases that helps protect air quality; Reduces sound levels with internal acoustic silencers; and provides efficient distribution to the atmosphere. CECO's technical team will include SCR engineers, acoustical engineers, in-house CFD, advanced-level structural engineering as well as a strong operational capability. The contract also includes provisions for CECO Technical Field Advisors to be onsite during the six-month fabrication period and the one-month start-up and commissioning period.