For personal use only

20 DECEMBER 2021

CORK TREE WELL DRILLING PROGRAM CONTINUES TO DELIVER RESULTS

HIGHLIGHTS

  • Gold assays reported from the RC drilling, include: o 26m @ 2.97 g/t Au from 111m (BTRRC025)
  1. 17m @ 3.09 g/t Au from 139m (BTRRC026)
  1. 12m @ 1.69 g/t Au from 133m (BTRRC021)
  1. 3m @ 5.15 g/t Au from 61m and 5m @ 5.01 g/t Au from 70m (BTRRC074)
  1. 7m @ 1.40 g/t Au from 56m (BTRRC033)
  1. 7m @ 2.21 g/t Au from 111m (BTRRC034)
    1. 8m @ 2.65 g/t Au from 40m (BTRRC041)
  • Intersections continue to confirm tenor and locations of lode compared with geological model.
  • Dip extensions of lode intersected consistently through-out strike length of project. Open at depth, requiring further drilling to determine bottom of mineralised lode.

Brightstar Resources Limited (ASX: BTR) (Brightstar or the Company) is pleased to announce further assay results from the successful RC drilling program at Cork Tree Well, located in the Laverton Gold belt of Western Australia.

For personal use only

RC samples at Cork Tree Well.

Commenting on the latest results, Managing Director, Mr Hobba, said: "The opportunity for Brightstar at the Cork Tree Well project continues to grow with more intersections returned down-dip and outside of the current JORC Resource envelope. With an additional 22 holes returned in this latest batch of analyses, we have now received 69 holes of the 89 holes completed at Cork Tree Well. We are keen to share the results of the final 20 holes when received, and QAQC and analytical review is completed."

Discussion of Results

Results to date from the Cork Tree Well RC drilling program (69/89 holes) have confirmed the location of the lodes as interpreted in the current Resource model, furthermore the average grade of many of the intersections appear to be higher than previous holes and the modelled Resource headgrade. Brightstar therefore expects these results to contribute to a more robust JORC compliant Resource and eventually JORC compliant Reserve. For the first exploration program conducted on this area since 2012 this is an encouraging outcome.

We are currently awaiting the return of re-assays of the original intersections of nickel before interpreting the opportunity for ongoing nickel prospectivity.

Figure 1 below indicates the drill hole collar locations for the reported holes in this announcement and the pending assays currently outstanding.

2

For personal use only

Figure 1: Plan view of Cork Tree Well drill collar locations and assays returned

3

For personal use only

Gold Mineralisation Discussion

The additional 22 holes returned in this batch included significant (> 1g/t Au) assays from 19 holes including re-assays from 2 holes. Overall, this means that 53 of the 69 holes assayed to date have contained significant results.

Holes near the northern end of the southern pit, adjacent to the 'saddle' between the pits, have had some of the better intersections.

The best intersection returned so far is 26m @ 2.97g/t Au from 111m from BTRRC025.

Table 1 below lists the significant gold intersections received to date.

Appendix 2 lists the relevant hole details.

Hole Number

From (m)

To (m)

Width (m)

Grade (g/t)

BTRRC009

130

132

2

1.38

BTRRC012

108

110

2

1.08

BTRRC013

100

105

5

2.83

BTRRC016

96

97

1

3.03

BTRRC018

94

98

4

2.12

BTRRC019

102

109

7

1.26

BTRRC020

162

166

4

1.92

BTRRC021

133

145

12

1.69

BTRRC022

112

128

16

3.26

133

136

3

1.82

BTRRC023

160

176

16

1.22

89

93

4

1.22

BTRRC024

96

98

2

3.3

102

113

11

3.12

BTRRC025

105

106

1

1.35

111

137

26

2.97

BTRRC026

139

156

17

3.09

160

161

1

1.17

BTRRC027

126

132

6

1.67

BTRRC029

120

122

2

2.81

130

137

7

2.84

BTRRC031

121

127

6

1.3

131

143

12

4.25

BTRRC032

176

183

7

3.5

193

200

7

1.87

BTRRC033

56

63

7

1.4

BTRRC034

111

118

7

2.21

BTRRC035

131

132

1

1.54

136

144

8

1.57

4

only

BTRRC036A

114

116

2

1.39

119

123

4

1.45

BTRRC037

74

81

7

1.94

BTRRC038

81

82

1

1.21

29

30

1

1.35

BTRRC039

46

48

2

1.62

71

74

3

1.29

11

12

1

1.78

use

BTRRC040

31

32

1

1.88

66

67

1

2.78

BTRRC041

40

48

8

2.65

56

57

1

1.97

31

33

2

1.13

BTRRC043

40

41

1

1.16

43

45

2

1.25

personal

BTRRC044

99

100

1

4.14

BTRRC046

118

122

4

1.17

BTRRC060

107

110

3

4.38

BTRRC062

104

109

5

1.45

BTRRC066

97

100

3

1.95

BTRRC068

103

107

4

1.33

BTRRC069

42

47

2

3.69

BTRRC070

74

75

1

2.08

BTRRC072

23

24

1

20.32

29

35

6

5.56

BTRRC073

82

86

4

2.75

92

94

2

1.38

61

64

3

5.15

BTRRC074

65

68

3

1.01

70

75

5

5.01

96

98

2

16.84

For

BTRRC075

102

104

2

2.43

137

139

2

6.23

BTRRC076

140

141

1

1.18

BTRRC077

48

50

2

2.06

BTRRC078

69

70

1

1.14

71

72

1

1.28

BTRRC080

71

72

1

1.55

42

43

1

5.68

BTRRC081

48

49

1

1.36

58

65

7

3.03

68

74

6

2.6

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Brightstar Resources Ltd. published this content on 19 December 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 19 December 2021 22:19:04 UTC.