BCM Resources Corp. announced that the Company completed Phase 2 drilling exploration at its Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo project in the southwestern part of Utah, USA. Phase 3 drilling at TK is scheduled to begin in the forthcoming fall season.

"B" also reports the results of age dating on the porphyry intrusive bodies and molybdenum mineralization discovered to date at TK. Drilling Results: The Company completed drilling 6 additional core holes at TK in 2021 and 2022. The initial discovery hole TK1 was drilled in 2018.

The assay and geochemical results for the new drillholes are reported below. A new, high-grade Cu-Au-Ag-Mo body of skarn was discovered in hole TK6, the "Eureka Skarn." The associated intrusive will be searched for in upcoming Phase 3 drilling program. Summary of Drillhole TK6.

TK6 was collared 950m NW of TK1, away from the main body of highly magnetic biotitic quartz-monzonite porphyry (QMP). This is the deepest drillhole on the property so far and was stopped at 3,940 ft. At the depth of 1668 ft, it intercepted the mineralized "Eureka Skarn".

From 2960 to 3930 ft depth, the drillhole went through a strongly mineralized magnetite-pyrrhotite-chalcopyrite skarn with scattered molybdenite. Cu-Mo-Au-Ag mineralization in the 970 ft interval graded an average of 0.03 g/t Au, 3 g/t Ag, 0.163% Cu, and 0.0093% Mo, including the 230 ft interval from 3220 to 3450 ft where the skarn mineralization assayed 0.06 g/t Au. 5.7 g/t Ag, 0.41% Cu and 0.013% Mo.

The grade 10 ft interval from 3400-3410 ft assayed over 1% Cu and 0.186 g/t Au, 16.6 g/t Ag, and 58 ppm Mo. Summary of Drillhole TK5: Drillhole TK5 was collared 990m to the NW of TK1. This hole went through a very thick cover of post-mineral lithified fanglomerates 1595 ft (486.2 m) thick.

Underneath, it intercepted a mineralized limestone-dolostone skarn that carried 0.078% Cu and 0.006% Mo with minor gold in the 110 ft (33 m) interval starting at 2670 ft (905 m). At depth of 2780 ft (847 m), the drillhole was terminated still in mineralized skarn due to a fault zone causing drilling complications. Summary of Drillhole TK3: TK3 was situated at 570 m WNW of hole TK1 and was drilled at 70 degrees angle to the SW.

It presented a big drilling challenge and consequently was lost at 2034 ft (620 m). It crossed from lithified fanglomerate into a skarnified dolomite at 1452 ft (442.6 m), and into QMP at 1844 ft (562 m). Both QMP and skarn are mineralized with copper in QMP at 0.03% in the upper block and 0.02% in the QMP below.

In a shorter interval, a 25 ft (7.6 m) section of skarn yielded 0.06% Cu and 0.01% Mo, whereas a 30 ft (9.1 m) interval in the lower block from 1950 ft (594.4 m) to 1980 ft (603.5 m) carried predominantly molybdenum mineralization with Cu at 0.02% and Mo at 0.084%. The hole was stopped in mineralization due to a drilling failure. Summary of Drillhole TK3a: Drillhole was collared 36 m NNE of TK3, and went through a lithified fanglomerate cover of 1430 ft (435.9 m) thick, where it intercepted a mineralized quartz-monzonite porphyry intrusion with occasional blocks of skarnified dolomites from 1659 ft (505.7 m) to 1867 ft (569.1 m).

From 1428 ft (435.3 m) to 2870 ft (874.8 m), the 1442 ft-long (440 m) interval carried weak copper-molybdenum mineralization, with 0.02% Cu, and 0.008% Mo. Molybdenum increased with depth from 2260 ft (688.8 m) to 3652 ft (1113.1 m). At 1392 ft (428 m) it averaged 0.018% Mo and 0.011% Cu.

Summary of Drillhole TK2: This drill hole was a near duplicate of TK1, 29 m to the southeast of TK1, and was drilled in mid-2021. Drilling in TK2 went down to 2000 ft (609.6 m). At depth of 645 ft (196.6 m), it intercepted the biotite-quartz-monzonite porphyry intrusion with argillic (phyllic) alteration and weak sulfide mineralization (predominantly pyrite) in the interval of 1614 ft (491.9 m) to 2000 ft (609.6 m).

In the upper part from 645 ft (196.6 m) to 1205 ft (367.3 m) the mineralization is oxidized. Assay results indicate the anomalous presence of gold and the weak presence of copper in the 234 ft-long intervals (71 m) from 1434 to 1668 ft at 0.01 g/t Au and 0.02% Cu. In the shorter distance from 1434 to 1470 ft (36 ft total) yielding 0.07% Cu and 0.006% Mo.

Summary of Drillhole TK4: TK-4 was collared 146 m SSE of hole TK1 and was drilled northward at 80 degree angle. And completed to a depth of 1445 ft (440 m), where drilling problems forced termination of the hole. No significant visual copper mineralization was observed hence no assay samples were taken.