Auris Minerals Limited provided update on exploration activities completed during the December quarter 2020 within the Morck Well, Cashman and Cheroona Joint Ventures by Sandfire Resources Limited in the Bryah Basin, Western Australia. Air Core drilling continues with 61 holes completed for 3,617 metres. Further significant Copper and Gold results from the first pass Air Core drilling completed during the quarter include: 15m at 0.46% Cu from 55m incl 5m at 0.89% Cu from 65m ­ MWAC3356 5m at 0.21% Cu from 95m­ MWAC3503; 5m at 0.51 g/t Au from 15m ­ MWAC3541. All significant results from the regional Air Core drilling completed during 2020 remain open along strike to the east and west for up to 1,600 metres. Infill Air Core and RC Drilling is being planned to further evaluate significant results. Approximately 600 Air Core drill holes remain to be drilled.