Golden Rim Resources Ltd. announced it has commenced a 3,500m diamond drilling (DD) program at its Kada Gold Project (Kada) in Guinea. Highlights: Extensive diamond drill program to investigate the structural controls and confirm mineralisation widths of Kada's Massan and Bereko prospects. Diamond drilling program is anticipated to take approx.

two months with first results expected early April 2023. Further results from the current 10,000m reverse circulation (RC) drilling program are expected early March 2023. Following on from some results during the current RC drilling campaign, Golden Rim has commenced a 3,500m diamond drilling campaign on the Kada permit.

Diamond drilling to depths of up to 250 metres will target the structural controls of the mineralisation both at the Massan resource area and the Bereko prospect to assist the Company in further understanding the mineralised events that exist on the permit. The DD program includes follow-up exploration holes at the Bereko prospect after initial RC exploration drillholes intersected multiple zones of mineralisation (including 11m @ 6.3g/t gold and 10m @ 5.6g/t gold 1), as well as within the current resource area to increase confidence in the mineralised area. Drilling will also test numerous deeper exploration targets identified by recent gradient-array Induced Polarisation (IP) and Pole-Dipole IP geophysical surveys within the mineral resource area, including underneath previously reported 29m @ 8.5g/t gold 2 in hole KRC025.