American Creek Resources Ltd. report on an additional 17 holes from JV partner Tudor Gold’s 2017 drill program on the Copper Belle zone at the Treaty Creek Project located in the Golden Triangle of northwestern British Columbia. The summary of results include the most promising gold intersections reported to date. Hole CB-17-26, returned 149.1m grading 1.78 g/t gold (from 97.8 to 246.9m), including a 59.2m interval of 2.84 g/t gold (from 97.8 to 157m depth). So far, 15 of the 16 holes drilled in the Copper Belle zone contain prominent mineralization, which continues to expand the size of this potential deposit and increases the area of the resource estimate for this zone. The Copper Belle 2017 resource delineation drill program comprised 27 holes to depths below 700m (an estimated 13,722m) and step-outs of 50m where topography permitted. Results from additional drill holes of the 2017 drill program at Copper Belle are still pending. Drill holes were targeted oblique to the northwesterly plunge of the main mineralized zone. A block of delineated mineralization will form the basis for a preliminary resource estimate. All drill holes were down hole surveyed at 25m stations using a Reflex Multi-shot device. Tudor’s 2016 Magnetotelluric Geophysical Survey program (MT Survey) was effectively utilized as a guide for the drill program. The MT Survey suggests that the mineralization continues to the southwest, toward the Iron Cap deposit of Seabridge Gold Inc. The MT Survey also suggests that the mineralized zone continues in all directions. Tudor’s 2017 drill program was located five kilometers north of the Iron Cap deposit and the Company intends to step out to the south in its 2018 program to see if it can determine a relationship between the two areas. The Treaty Creek Project is situated immediately north of Seabridge Gold’s KSM property and near Pretium’s Valley of the Kings Mine, both of which are located in BC’s Golden Triangle along the Sulphurets and Brucejack fault systems that continue northward into the Treaty Creek property. Tudor conducted a major drill program (approximately 20,000 metres) on the Treaty Creek property this past summer. The objective of the drill program was to define a gold resource on the Copper Belle zone and to determine the future potential of the high grade gold/silver/zinc GR2 zone located in a separate area adjacent to the Copper Belle. Seabridge Gold’s proposed development plan for their KSM Project includes an access tunnel system through the Treaty Creek property as a key component. The Copper Belle and GR2 deposits located on the Treaty Creek property are both situated in the area in which Seabridge is proposing to construct tunnels connecting their KSM gold deposits with critical infrastructure such as the mill and tailings facilities. The Treaty Creek Project is a joint venture between Tudor, Teuton Resources Corp., and American Creek. Tudor is the operator and holds a 60% interest with both American Creek and Teuton each holding respective 20% carried interests in the property (American Creek and Teuton are not required to contribute to their proportionate costs until a production notice is given).