ASX : ANL | ||||||
29 July 2022 | ASX Release | |||||
only | QUARTERLY ACTIVITIES REPORT | |||||
HIGHLIGHTS | ||||||
n Diamond drilling continues at 4.1Moz Kebigada Gold Deposit (7 holes completed, 1 hole | ||||||
use | remaining). | |||||
• Assay results received for GRDD036, GRDD037, GRDD038, GRDD039. Results for diamond holes | ||||||
GRDD039 (partial), GRDD040, GRDD041 are expected early August. | ||||||
n Results of Diamond Hole GRDD037 | ||||||
• 201m @ 0.97g/t Au from surface including | ||||||
§ 20.85m @ 2.05g/t Au from 82.20m | ||||||
personal | § 41m @ 1.30g/t Au from 125m | |||||
n | Appointment of Non-Executive Director Burt Li. | |||||
n | Results of Diamond Hole GRDD038 | |||||
• 60m @ 1.28g/t Au from surface including | ||||||
§ 6m @ 1.74g/t Au from 30m | ||||||
§ 6.5m @ 2.76g/t Au from 40.5m | ||||||
n Results of Diamond Hole GRDD039 | ||||||
• 59.99m @ 2.35g/t Au from 98.86 including | ||||||
§ 3.4m @ 8.85g/t Au from 103.88m | ||||||
§ 13.62m @ 3.20g/t Au from 142.23m | ||||||
n RC Drilling scheduled to commence first week of August. | ||||||
Amani Gold Limited (ASX: ANL) ("Amani" or "the Company") is pleased to provide shareholders with the | ||||||
following Quarterly Report for the three-month period ended 30 June 2022. | ||||||
For | ||||||
Diamond Drill Program at Kebigada |
Amani has now completed 7 of the 8 diamond drillholes planned at the Kebigada deposit. The Company is now drilling the final hole in the drill program. Samples for diamond holes GRDD039, GRDD040, GRDD041 have been dispatched to the laboratory for assay with results estimated in the first week of August 2022.
The goal of the diamond program is to test the continuity of identified mineralization along strike and down dip of the Central Ore Body confirmed in previously drilled diamond holes and depth extensions of broad mineralized zones within the Eastern Ore Body that were outlined in previous RC drilling completed in 2017.
Assay results have been received for the program and the results confirm broad mineralization zones within the existing ore body, mineralized areas intersected below the existing resource area, as well as a shallow high- grade zone of mineralization. (see Figure 2-5).
The Company has rescheduled it's planned Giro resource review to take place after the completion of it's diamond and RC drill programs.
25 Colin Street, West Perth WA 6005
Tel: +61 8 6186 3002 | www.amanigold.com | info@amanigold.com |
ASX:ANL
onlyuse personalFigure 1 - Map of 2022 Diamond Drilling Campaign For
- 2 -
ASX:ANL
For personal use only
TABLE 1 - DRILLHOLE SUMMARY
Hole ID | Easting | Northing | Elevation | End-of-Hole | Azimuth | Dip | Line | |||||||||||||||
(m) | (m) | |||||||||||||||||||||
GRDD036 | 748971 | 344313 | 852.04 | 551.16 | 43 | -55 | 725N | |||||||||||||||
GRDD037 | ||||||||||||||||||||||
749061 | 344258 | 859 | 513.50 | 43 | -55 | 650N | ||||||||||||||||
GRDD038 | 749026 | 344042 | 856 | 313.50 | 43 | -55 | 750N | |||||||||||||||
GRDD039 | 749093 | 344042 | 856 | 454.50 | 43 | -55 | 450N | |||||||||||||||
TABLE 2 - SIGNIFICANT INTERCEPTS1
Hole ID | From | To | Interval | Gold Grade | ||||||||||
(m) | (m) | (m) | (g/t) | |||||||||||
GRDD036 | 0 | 302.05 | 302.05 | 1.18 | ||||||||||
0 | 201 | 201 | 0.97 | |||||||||||
GRDD037 | ||||||||||||||
GRDD038 | 0.00 | 60.00 | 60.00 | 1.28 | ||||||||||
30.00 | 36.00 | 6.00 | 1.74 | |||||||||||
including | ||||||||||||||
40.50 | 47.00 | 6.50 | 2.76 | |||||||||||
GRDD038 | 78.00 | 87.00 | 9.00 | 0.99 | ||||||||||
103.05 | 134.60 | 31.55 | 0.94 | |||||||||||
GRDD038 | ||||||||||||||
154.00 | 184.03 | 30.03 | 1.21 | |||||||||||
GRDD038 | ||||||||||||||
GRDD038 | 253.00 | 264.00 | 11.00 | 0.97 | ||||||||||
283.90 | 293.00 | 9.10 | 1.14 | |||||||||||
GRDD038 | ||||||||||||||
69.50 | 80.00 | 10.50 | 1.17 | |||||||||||
GRDD039 | ||||||||||||||
GRDD039 | 98.86 | 158.85 | 59.99 | 2.35 | ||||||||||
103.88 | 107.28 | 3.40 | 8.85 | |||||||||||
including | ||||||||||||||
142.23 | 155.85 | 13.62 | 3.20 | |||||||||||
GRDD039 | 222.00 | 239.53 | 17.53 | 1.22 | ||||||||||
- 3 -
ASX:ANL
For personal use only
Figure 2 - Cross Section 750N showing 2020 resource model blocks and Au (ppm) contours with GRDD036 intersection of 302.05m @ 1.18g/t Au highlighted as a thick black line along the drillhole trace.
Figure 3 - Cross Section 650N showing 2020 resource model blocks and Au (ppm) contours with GRDD037 intersection of 201
- 0.97g/t Au and 25.06m @ 0.64g/t Au highlighted as a thick black line along the drillhole trace
- 4 -
ASX:ANL
For personal use only
GRDD039
Figure 4 - Cross Section 450N showing GRDD039 and the 2020 resource model blocks and Au (ppm).
GRDD038
Figure 5 - Cross Section 750N showing GRDD038 and the 2020 resource model blocks and Au (ppm).
- 5 -
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Amani Gold Limited published this content on 28 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 28 July 2022 22:03:10 UTC.