Amani Gold Limited announce that it has commenced its diamond drilling campaign at the Company's 4.1Moz Kebigada Gold Deposit. 8 diamond drill holes planned for a total of 3,500 meters across the Kebigada Central Ore Body (COB) and Kebigada Eastern Ore Body (EOB). Program will test the continuity of identified mineralization along strike of the COB confirmed in previously drilled diamond holes. Drilling will also test depth extensions of broad mineralized zones within the EOB that were outlined in previous RC drilling completed in 2017: GRRC222 17.8m at 2.17g/t Au from 49m; GRRC225 62m at 1.75g/t Au from 31m; GRRC235 37m at 1.85g/t Au from 4m.