Amani Gold Limited Announces Drillhole GRDD037 Confirms Broad Gold Mineralisation Zones
for assay with the samples for the third diamond hole in the program (GRDD038). Amani has now completed 3 of the 8 diamond drillholes planned at the Kebigada deposit for H1/22 with assay results pending for diamond hole GRDD038. The Company is currently completing drilling of hole GRDD039. The goal of the diamond program is to test the continuity of identified mineralization along strike and down dip of the COB confirmed in previously drilled diamond holes and depth extensions of broad mineralized zones within the EOB that were outlined in previous RC drilling completed in 2017. RC drilling preparation continues with drilling anticipated to commence in May 2022 at Kebigada South-East. The RC drilling campaign aims to define potential high grade satellite deposits Kebigada South-East and Congo Ya Sika which do not currently form part of the Giro project resource.