TMAC Resources Inc. provided the last installment of 2018 exploration drilling results from the Doris Below The Dyke at Hope Bay. The drilling at Doris has continued to upgrade confidence in and expand upon the high grade BTD Extension zone and supports their 2019 strategy for continued reserve and resource expansion. Drill results represent the last 28 of 95 drill holes (13,327 metres total) completed during the 2018 Doris BTD drilling program. Drilling in 2018 has defined the BTD Extension zone over a more than 300 metre strike length with mineralization remaining open to the north. A 60,000 metre drill program is planned for the Hope Bay belt in 2019, which is materially greater than the 34,000 metre program in 2018. TMAC has set ambitious targets to grow reserves and resources at Doris, especially at Doris BTD, supported by extension of the Doris BTD ramp development to the north to provide access to a further 100 metres of strike length. As well, drilling at Madrid North targeted to advance these deposits towards development and production, include a Suluk winter program that is underway and near-surface drilling program at Naartok East. TMAC will be re-initiating its Boston exploration program this summer and will follow with a defined winter program. TMAC also plans to conduct a regional exploration program that is focused on established targets which are in proximity to existing and planned infrastructure. The Doris BTD is north of and beneath the diabase dyke and is the equivalent of the high grade Doris North zone. Initial results of the 2018 diamond drilling on the BTD Extension zone were reported in June and November 2018 and the results reported now are from the remaining 28 drillholes from the 2018 program. The BTD Extension zone returned high grade intersections throughout the 2018 program and has now been defined over more than 300 metres along strike. An unusually high proportion of diamond drillhole vein intercepts with visible gold detected, were returned in the high grade intercepts. Significant assays results reported now include TM50234 which intersected 965 g/t Au over 0.3 metres, TM50235 intersecting 52.8 g/t Au over 1.9 metres and TM5038 intersecting 30.0 g/t Au over 7.1 metres. Assay intervals reported now are down hole lengths and true widths are estimated to range from 30-90% of down hole lengths. Results from the 2018 diamond drilling will be incorporated into the December 31, 2018 year-end Mineral Resource and Mineral Reserve statement. The BTD zone remains open to the north, and the 2019 drilling program has commenced as development of the BTD exploration ramp has reached the next diamond drilling platform. Development of the BTD exploration ramp will continue north in 2019 and provide additional drilling platforms through 2019 and access to a further 100 metres of strike length. The Company also has the potential to drive a ramp southward into the Doris Connector BTD, which would either be actioned late in 2019 or in 2020 dependent on available development capacity.