Symbol Mining Limited announced that it has completed a 3,500m RC drilling programme at the Aisha prospect which is located approximately 1kn NNE of the Macy deposit within the Imperial JV Project. The Aisha vein system was identified as a priority target and has been the subject of artisanal mining in 2015 for high grade massive galena. Artisanal mining ceased in early 2016 and since then the project area has been devoid of artisanal activity. The Aisha drilling programme has defined mineralization over a strike of at least 800m and the intersections have identified multiple veins of mineralisation. The remainder of the drill assay results are expected by mid to late April 2018. 39 reverse circulation holes have been drilled for a total of 3,439m. Based on encouraging geological logging of the RC cuttings and the drill intersections, a 1,500m diamond core infill and extension drilling programme is being formulated along with a 3,500m RC programme for precollars and north south extension drilling at Aisha plus initial testing of further regional exploration targets. Drilling should recommence in late April 2018.