Investor Information
SUPPLEMENTAL
Published May 9, 2022
Table of Contents
1.
Energy Sources
2. Processing, Infrastructure & Logistics
3. Consumer Channels
4. Sustainability
5. Energy Expansion
6. Technology Development
7. Integrated Model Calculation
8. Glossary
EAnpepregnydix Sources
202003-038
Oil Sands Energy Sources
*All values net to Suncor
In Situ
Firebag
215,000 bpd capacity Suncor WI 100% 2,686 mmbbls 2P reserves1
MacKay River
38,000 bpd capacity Suncor WI 100% 486 mmbbls 2P reserves1
1, 2 See Slide Notes and Advisories.
Future opportunities2
ES-SAGD Firebag Expansion Lewis (SU WI 100%) Meadow Creek (SU WI 75%)
Mining
Base Plant
350,000 bpd capacity Suncor WI 100% 1,158 mmbbls 2P reserves1
Note: Millennium and North Steepbank Mines do not supply full 350,000 bpd of capacity as significant in situ volumes are sent through Base Plant
Syncrude
Suncor assumed operatorship on Sept 30, 2021 205,600 bpd net coking capacity Suncor WI 58.74% 981 mmbbls 2P reserves1
Fort Hills
Suncor operated 105,000 bpd net capacity Suncor WI 54.11% 1,248 mmbbls 2P reserves1
Long life, low decline reserves base
Illustrative annual AFFO2 profiles3
Typical attributes1 of North American oil plays
Initial capitalDecline rate
Medium
In SituOffshore
~10% of Suncor's 2022 production guidance
Medium
Tight Oil
50 Years
Sustaining costs
Medium
Beneficial attributeChallenging attribute
1, 2, 3 See Slide Notes and Advisories
Operating cost
MediumMedium
Reservoir riskRecovery factor
MediumMedium
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Suncor Energy Inc. published this content on 09 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 09 May 2022 23:53:06 UTC.