Soiltech has signed a contract with Maersk Drilling for treating contaminated water (offshore slop services) from the drilling process onboard Maersk Drilling's Maersk Resolute. The estimated contract duration for the Maersk Resolute is 575 days plus options to add additional work scopes with a total estimated duration of 228 days. Soiltech will be onboard the rig and support projects for both TotalEnergies and Petrogas in the UK and Dutch sector respectively.

The STT is a mechanical technology which is used on location, treating water contaminated with oil and particles. The treated oil and water may be reused in the drilling process. By utilizing the STT, the client reduces the environmental footprint through lowering its CO2 emissions whilst reducing the well cost.