Silver North Resources Ltd. announced that it has completed an option agreement with three prospectors who hold the GDR Project in southern Yukon. The GDR Project consists of three claim groups totaling 150 claims in the Silvertip-Midway District and in the vicinity of Silver North's Tim Silver Property which is under option to Coeur Mining Inc. The GDR Project claims cover geology prospective for Carbonate Replacement Deposits similar to that being explored at Tim and at Coeur's nearby Silvertip Mine Project. Under the terms of the agreement, Silver North will make staged cash payments totalling $102,000 over four years ($6,000 payable on the Closing Date defined as being 5 business days following the TSX Venture Exchange's approval) and staged share payments totalling 1,560,000 common shares over four years (180,000 shares on the Closing Date) to earn a 100% interest in the GDR Project, subject to a Net Smelter Return (NSR) royalty of 2.4% (0.9% of which can be purchased for $2 million).

GDR Silver Project: The three properties comprising the GDR Project (Veronica, MR, and MFW claim groups) are road and trail accessible with excellent potential for high-grade Ag-Zn-Pb CRD mineralization similar to the nearby Silvertip mine project owned by Coeur. The project claims have Ag-Pb-Zn showings and multi-element soil geochemical anomalies underlain by Paleozoic limestone, in a similar geological setting to CRD mineralization at Silvertip. Veronica is located 11 km by road north of Silvertip and within 2km of Silver North's Tim project.

MR and MFW are located a further 10km and 17km north, and north of the Alaska Highway. At Veronica a multi-element soil anomaly has been defined over an area 450 by 450 m and is open to the east with values that range from 0.3 - 31.1 ppm Ag, 60 - 3100 ppm Pb, and 50 -612 ppm Zn. This new anomaly has not been trenched, drilled or explained by prospecting and presents a compelling target for exploration follow up.

Limestone and quartzite outcrop in the area. Further south on the Veronica property and along the Yukon border, high Ag, Pb and Zn values in soils are associated with quartz veins cutting Paleozoic shales. Soil values range from 0.1 - 8.67 ppm Ag, 28 - 2780 ppm Pb, 25 - 2500 ppm Zn, and have not been explained.

The nearby Stollery barite prospect has had historic soils sampling and cat trenching and may represent a sedex Zn-Pb-Ag-barite environment. The MFW property covers a discontinuous 1500 m-long Ag-Pb-Zn soil anomaly that remains unexplained. Confirmation sampling within the anomaly conducted in 2016 returned 14 of 61 soil samples with >2.0 ppm Ag, with a high of 17.95 ppm Ag, 348 ppm Pb, 1060 ppm Zn, 143.5 ppm As and 10.65 ppm Sb.

The anomalous elements are suggestive of a potential CRD style mineralized source. Nearby outcrops consist of limestone and quartzite. The MR property covers a number of historic trenches excavated to explore a series of carbonate-hosted, zinc-oxide prospects.

The best results include: 20m of 5.05% Zn, 1.97% Pb and 3.4 ppm Ag and 1.5m of 8.8% Pb and 51.4 ppm Ag. A vein structure discovered in 2016 and chip sampled in 2018 returned 1m @ 477 ppm Ag, 9.29% Pb and 0.91% Zn. Soil sampling to the southeast of this structure has defined an anomaly over 300 by 500m of > 2 ppm Ag and up to 7.6 ppm Ag with associated anomalous Pb and Zn concentrations.

The anomaly remains unexplored and unexplained. The Veronica claim group partially lies within the Area of Interest surrounding the Tim Property, and as such, Silver North is obligated to offer the Veronica for inclusion within the Tim Option agreement between Silver North and Coeur. If Coeur agrees to include the Veronica claims, it will reimburse one half of Silver North's acquisition costs.

Other Properties: Silver North has dropped the lease on the Twin Canyon gold property in southwest Colorado and will be transferring its claim holdings to the underlying vendors. Management was unsuccessful in finding a partner to move the project forward and felt that focussing on Silver North's core assets is the most effective use of it capital resources.