Purepoint Uranium Group Inc. announced that equipment and crews have been mobilized and drilling has commenced at the Hook Lake JV, a project owned jointly by Cameco Corp. (39.5%), Orano Canada Inc. (39.5%) and Purepoint Uranium Group Inc. (21%). The project lies on the southwestern edge of Saskatchewan's Athabasca Basin and is adjacent to and on trend with recent high-grade uranium discoveries including Fission Uranium's Triple R deposit and NexGen's Arrow deposit. Patterson Corridor and Derkson Corridor in the Athabasca Basin, Saskatchewan (CNW Group/Purepoint Uranium Group Inc.). The two drill program anticipates 6,600 metres of diamond drilling, approximately 17 holes; One drill has begun drilling at the Dragon zone and will move north along the primary shear to complete six holes; The second drill will test the Spitfire mineralization at a depth of approximately 500 metres before moving on to the Derkson Corridor; Ten diamond drill holes have been planned to begin testing the Derkson Corridor, just east of and parallel to the Patterson Lake Corridor, where historic initial drilling in 1978 by SMDC discovered uranium mineralization; The entire program is expected to be complete by April 2019.