MGX Minerals Inc. reported that joint venture partner Power Metals Corp. has commenced a 2,000 metre drill program on the Northeast Dyke at Case Lake east of Cochrane, Ontario. Drill hole PWM-18-51, the first drill hole on the Northeast dyke and on the entire claim, is in progress and is collared 5 m north of the spodumene pegmatite outcrop. This shallow hole will drill underneath the location of the surface assay of 7.14 % Li2O. The Northeast Dyke is located 900 m northeast along strike of the recently completed 5400 m drill program on the North and Main Dykes and is within the same tonalite dome as the North and Main Dykes. Since the Northeast, North and the Main Dykes are along the same strike and within the same dome, this indicates that they were emplaced along the same deep-seated structure. The Northeast Dyke has a pair of parallel pegmatite dykes: north and south outcrops similar to the North and Main Dykes that were recently drilled.