MOD Resources Ltd. announced the pre-feasibility study (PFS) for a proposed open pit mine and copper concentrator at its 70%-owned T3 copper-silver deposit in the Kalahari Copper Belt, Botswana has delivered outstanding results. MOD has presented two cases for the PFS, with the Base Case based on a Proved and Probable Ore Reserve and an Expansion Case with a Production Target utilising the Base Case Ore Reserve and additional production from existing Inferred, Measured and Indicated Mineral Resources from Year 4. The PFS Base Case with plant throughput of 2.5Mtpa indicates a technically sound and financially robust project generating $730 million (AUD 960 million) EBITDA over 9 years. Due to the robust financial outcomes indicated by the PFS, the boards of MOD and joint venture partner, Metal Tiger Plc (30%) have agreed to proceed with a Feasibility Study (FS) commencing first quarter 2018.