EV NICKEL INC. announce assay results from 148 surface samples from the CarLang Trend targeting areas over the Large-Scale nickel target in the northeast of its Shaw Dome Project. The surface sampling program was focused on the Carlang B target, one of 5 large scale targets identified on the Company's Shaw Dome Project located approximately 2km from its flagship Carlang A deposit. The surface sampling program was designed to identify the distribution of dunites and peridotites along the northwestern arm of the CarLang Trend in an area, referred to as CarLang B, focusing on an area approximately 1.8km long by 0.5km wide.

Of the 148 samples submitted for analysis, 123 of the samples were from the targeted peridotites and dunites, where 79% of the assay samples graded 0.24% nickel or better, ranging from 0.15% Ni to 0.34% nickel, indicating that the CarLang B area represents another potential zone of similar grade material as the Company's flagship CarLang A Deposit. The Carlang A deposit hosts, in accordance with National Instrument 43-101, a combined Resource of 1.1B tonnes @ 0.24% Ni consisting of an Indicated Resource of 0.5B tonnes @ 0.25% Ni and an Inferred Resource of 0.5B tonnes @ 0.23% Ni. As part of the 2024 summer field season, the Company intends to expand the detailed surface sampling program to include the remaining areas along the CarLang Trend to the north and east of the CarLang A Deposit.

This work is expected to begin in mid-June and will be coordinated with other work to be completed on the CarLang A Deposit including a potential stripping and mapping program. Additional details on the exploration program will be released in due course.