Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.
CHINA ENERGY ENGINEERING CORPORATION LIMITED*
(A joint stock company incorporated in the People's Republic of China with limited liability)
(Stock Code: 3996)
VOLUNTARY ANNOUNCEMENT
ENTERING INTO AN EPC CONTRACT FOR THE 500MW DISTRIBUTED
PHOTOVOLTAIC POWER STATION PROJECT IN EGYPT BY A
SUBSIDIARY OF THE COMPANY
This announcement is made by China Energy Engineering Corporation Limited (the "Company") on a voluntary basis.
The board of directors of the Company (the "Board") is pleased to announce that, recently, China Gezhouba Group Co., Ltd.* (中國葛洲壩集團股份有限公司), a subsidiary of the Company, has entered into an EPC contract for the 500MW distributed photovoltaic power station project in Egypt (the "Project").
The Project is located in multiple locations in Egypt. The scope of work comprises the construction of a new 500MW distributed photovoltaic power station in Egypt, specifically including the design, construction work, equipment procurement, construction and installation, commissioning and supply of spare parts, etc. The contract amount of the Project is approximately USD287.5 million. The contract is valid for a term of 3 years.
By Order of the Board
CHINA ENERGY ENGINEERING CORPORATION LIMITED*
Wang Jianping
Chairman
Beijing, the PRC
3 January 2020
As at the date of this announcement, the executive directors of the Company are Mr. Wang Jianping, Mr. Ding Yanzhang and Mr. Zhang Xianchong; the non-executive directors are Mr. Ma Chuanjing, Mr. Liu Xueshi and Mr. Si Xinbo; and the independent non-executive directors are Mr. Ding Yuanchen and Mr. Cheung Yuk Ming.
- For identification purpose only
Attachments
- Original document
- Permalink
Disclaimer
CEEC - China Energy Engineering Corp. Ltd. published this content on 03 January 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 03 January 2020 09:42:06 UTC