17 January 2014
The Company Announcements Office
Australian Securities Exchange Limited
via electronic lodgement
ADDENDUM TO ANNOUNCEMENT
Birimian Gold Limited (ASX:BGS; "Birimian", "Company") advises that it is including a table to support its announcement dated 14 January 2014 because it inadvertently omitted information required under Listing Rule 5.7.2.
Table 1 attached summarises the reported drill holes at the Massigui Project, Mali. Yours sincerely
Beverley Nichols
Company Secretary
www.birimiangold.com
Hole_ID | North (WGS84_29N) | East (WGS84_29N) | Dip | Azm | Hole Depth | From | To | Width | Au g/t |
NTAG1287 - 1693 | Refer to Figures 2 to 4 for graphical pres entation of auger collars . | Refer to Figures 2 to 4 for graphical pres entation of auger collars . | All holes are drilled vertically. Dip = -90 | All holes are drilled vertically | Average hole depth was 8.5m . Minim um hole depth was 3m . Maxim um hole depth was 15m | See notes | See notes | See notes | See notes |
Note s . | |||||||||
Auger drilling is a reconnais s ance exploration technique. Typically the las t m eter of each auger hole repres ents in s itu m aterial. As s uch, res ults are pres ented as end of hole point s am ples for each auger hole as per the attached plans . Drill hole inters ections are not reported in this announcem ent. |
distributed by |