Commencing Saturday 6 January 2018, works on the M7 mainline between Junction 8 (Johnstown) and Junction 10 (Naas South) will commence in the median. To accommodate these works, the following traffic restrictions will be put in place.

  • Speed restricted to 60kph through the work site, which will be monitored by An Garda Síochána.
  • 2 lanes of traffic will be maintained in both directions during daytime hours.
  • Traffic will be moved onto the existing hard shoulder and the current Lane 1. Please see typical cross section diagram below.
  • Traffic lane widths will be restricted to 3m and 3.25m in width.
  • There will be no lay-bys or areas within the work zones for stopping.

Transport Infrastructure Ireland published this content on 04 January 2018 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 04 January 2018 15:59:09 UTC.

Original documenthttp://www.tii.ie/news/press-releases/m7-traffic-advisory/

Public permalinkhttp://www.publicnow.com/view/DD85BF34CBDF9A17948C8F7936B0AE23B1E1330A