IAMGOLD Corporation provided production guidance for the year 2025. The company attributable gold production, expected to be in the range of 735,000 to 820,000 ounces. Production is expected to be higher quarter over quarter through 2025 as Côté ramps up to design capacity by the end of 2025 and the grade at Essakane increases during the second half of the year based on the mining sequence.