DRDGOLD LIMITED reported unaudited consolidated production results for the quarter ended 31 March 2025. For the quarter, the company reported Gold produced of 1,093 kg, Ore milled was 6,046,000 metric tonnes. Yield was 0.181 Metric (g/t).
Tonnages were lower, mainly as a result of unprecedented wet weather conditions, which inhibited access to certain sites and as a consequence, impacted the desired blend of reclamation material. This ultimately affected the average yield achieved.