DRDGOLD LIMITED reported unaudited consolidated production results for the six months ended 31 Dec. 2024. For the period, the company reported gold production of 2,564 kg against 2,547 kg a year ago, Gold produced was 82,434 oz against 81,888 oz a year ago.
Ore milled was 12,916,000 metric tonnes against 11,165 metric tonnes a year ago. Yield was 0.199 Metric (g/t) against 0.228 Metric (g/t) a year ago.