Presentation of

RESULTS

for the six months ended 31 December 2024

Niël Pretorius

Chief Executive Officer

Riaan Davel

Chief Financial Officer

Results for the six months ended 31 December 2024 / Page 3

CONTENTS

1

Our purpose and Vision 28

Slide 5

4

Sustainable development performance

Slide 22

Setting up for the next phase

Slide 6

Environmental performance

Slide 23

Solar plant completion

Slide 7

Social performance

Slide 24

Capital infrastructure

Slide 8

Governance

Slide 25

2

Operating performance

Slide 10

5

Looking ahead

Slide 26

Ergo operating trends

Slide 11

Outlook

Slide 27

FWGR operating trends

Slide 12

Delivering on our purpose

Slide 28

Group operating trends

Slide 13

Contact us

Slide 29

3

Financial performance

Slide 14

Ergo financial results

Slide 15

FWGR financial results

Slide 16

Group financial results

Slide 17

Financial review: P&L

Slide 18

Financial review: SFP

Slide 19

Financial review:SCF

Slide 20

Share price

Slide 21

Results for the six months ended 31 December 2024 / Page 4

PERFORMANCE AT A GLANCE

as at 31 December 2024

18th consecutive financial year of dividends: lnterim cash dividend of 30 cps

Financial

Operational

Sustainable development

Revenue

Operating profit

R3 802.3m

R1 578.7m

28% increase

74% increase

26%

Headline

earnings

increase

R970.1m

in the average Rand

gold price received to

65% increase

R1 478 663/kg

Capital expenditure

R947.6m

(HY1 FY2024: R1 074.7m)

Production

2 564kg

1% increase

Throughput

12.9Mt

16% increase

Cash operating costs of

R866 221/kg

6% increase

All-in sustaining costs margin

of 35%

Average yield

0.199g/t

(HY1 FY2024: 0.228g/t)

Rand per tonne (R/t)

R172

9% decrease

Solar plant and battery energy storage system practically commissioned

Electricity

Potable water

consumption

consumption

141 333MWh

551 MI

16% decrease

3% increase

Hectares

Dust exceedances

vegetated

increased

28ha

to 3.7%

(HY1 FY2024: 15ha)

of total number of

measurements

No fatalities

Section 1

Our purpose and Vision 28

Results for the six months ended 31 December 2024 / Page 6

Positioning for the next phase: Vision 28

Vision 28: capital infrastructure

3mtpm

6tpa

development designed for

FY2028 and beyond

Tonnage throughput

Gold production

fund Ergo 2.0

1.650mtpm

Depleted Ergo sites replaced to

Interim throughput capacity

FWGR Phase II expansion underway

0.6mtpm to 1.2mtpm

To make this a reality, we are pursuing our aggressive capital reinvestment programme to create the capacity infrastructure to

realise our Vision for FY2028 and beyond

Results for the six months ended 31 December 2024 / Page 7

PRACTICAL COMPLETION OF OUR SOLAR PLANT AT ERGO

A milestone in sustainable energy

Advancing circularity, optimising costs and strengthening energy security

2020

2021

2022

2023

2024

Conceptualisation

Feasibility study and

Completion of

and planning

regulations

feasibility study and

commencement

Exploring solar

Regulatory

Definitive feasibility

power as a backup

approval

study completed

amid ongoing

Ongoing definitive

Commencement of

energy crises and

feasibility study

Phase 1 of the solar

disruptions

project at Ergo

Installation of

medium voltage grid

connection

Continuous capital

Enhancing operational efficiency, sustainability

investment and

and reducing electricity costs

approval of Phase 2

Phase 2 60MW

Solar plant and BESS

To contribute

solar project

practically

approximately half of

approved

commissioned

Ergo's energy

Battery energy

Formal grid

consumption in FY2025,

storage system

connection certificate

reducing Ergo's electricity

(BESS) of 160MWh

received

costs by R9-R15/t

approved

Results for the six months ended 31 December 2024 / Page 8

CAPITAL INFRASTRUCTURE DEVELOPMENTS TO REALISE VISION 2028

Enabling production capacity growth and operational resilience

WITHOK TSF RECOMMISSIONING AT ERGO

First public consultation for the recommissioning of the Withok TSF completed in December 2024.

Scoping documents in support of environmental authorisations to the DMRE submitted and commenced a water use license application to the DWS.

July 2025 - submission of all required final documents.

Results for the six months ended 31 December 2024 / Page 9

CAPITAL INFRASTRUCTURE DEVELOPMENTS TO REALISE VISION 2028 continued

Enabling production capacity growth and operational resilience

PHASE II PROJECT AT FWGR

Regional Tailings Storage Facility (RTSF)

Construction of the RTSF progressing well since work started.

2 million m3 of ground moved to date.

To commence installation of the liner for the facility.

Extensive Pipeline Infrastructure

Approximately 13km of residue pipelines and water pipelines installed.

Driefontein 2 Plant expansion

Civil works on the expansion of Driefontein 2 Pant progressing well and majority of earthworks have been completed.

Contractor appointed to commence with Structural, Mechanical Installation, Plate work and Piping (SMPP) on site.

Section 2

Operating performance

Attention: This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

DRDGOLD Limited published this content on February 18, 2025, and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on February 18, 2025 at 08:28:05.159.