Alamos Gold Inc. reported new results from underground and surface drilling at the Island Gold Mine. Exploration drilling continues to extend high-grade gold mineralization across the Island Gold Deposit, as well as within several hanging wall and footwall structures. Additionally, the regional exploration program has been successful in intersecting high-grade gold mineralization at the past-producing Cline-Pick and Edwards mines, located seven kilometres from the Magino Mill.

Island Gold Main zone exploration highlights: high-grade mineralization extended outside of Mineral Reserves and Resources in the E1E and C-Zones. These zones are the main structures which host the majority of currently defined Mineral Reserves and Resources at Island Gold. New highlights include1: Island West (C-Zone) 21.58 g/t Au (21.58 g/t cut) over 5.07 m (1025-503-05); 14.81 g/t Au (14.81 g/t cut) over 2.02 m (1025-497-22).

Island East (E1E-Zone) 15.87 g/t Au (15.87 g/t cut) over2.72 m (945-624-83). Island Gold Hanging Wall and Footwall exploration highlights: high-grade gold mineralization intersected within new and recently defined hanging wall and footwall zones across the main Island Gold Deposit. These zones represent significant opportunities to continue to grow near mine Mineral Reserves and Resources which are low-cost to develop, given their proximity to existing infrastructure.

New highlights include: Island West Hanging Wall and Footwall Zones B Zone, 37.26 g/t Au (14.88 g/t cut) over two.86 m (850-472-38). NS1 Zone, 11.66 g/t Au (11.66 g/t cut) over 9.37 m (850-472-32); and 33.33 g/t Au (28.09 g/t cut) over 1.83 m (850-472-23). NS2 Zone: growing parallel structure, 200 m east of NS1 Zone 64.85 g/t Au (12.52 g/t cut) over 3.09 m (1025-503,03); and 11.89 g/t Au (11.,89 g/t cut) over second.20 m (1025-503 -02).

Island East Footwall Zones E1D Zone, 21.42 g/t Au (21.,42 g/t cut) over 4.00 m (945-6 24-73). E1D Zone, 21.,42 g/t Au (21.42 g/t cut) across 4.00 m (9 45-624-73). E1D1 Zone, 86.36 g/t Au (50.87 g/t cut") over 2.01 m (945-648-79); and 18.94 g/t cut) over Second Quarter Zone: growing parallel structure,200 m east of NS1 Zone, 64.85 g/t gold mineralization intersected withinnew and recently defined hanging wall andfootwall zones across the main IslandGold Deposit.

These zones represent significant opportunity to continue to grow near mine mineral Reserves and Resources which are high-cost to develop, given they proximity to existing infrastructure. New Highlights include: Island West Hanging wall and Footwall Zones, B Zone, 37.26g/t Au (14.89 g/t cut) across the main Island Gold deposit.