FlatironDragados, in joint venture with Skanska, have been awarded a $1-billion contract by the Virginia Passenger Rail Authority (VPRA) to build the Long Bridge North Project. The approximately one-mile rail link will stretch from East Potomac Park to Washington D.C.'s L'Enfant Interlocking. It is the first of a major two-phased construction initiative that will expand freight and passenger rail service and integrate local, regional, and national transportation networks.

The Long Bridge North Project is part of the larger 1.8-mile Long Bridge Project that will replace and enhance the busy rail corridor from Washington, D.C. into Arlington, Virginia with a series of linked, four-track modern rail bridges and corridors replacing the aging two track system. The project's refurbished eastern tracks - which currently serve freight and passenger traffic - will primarily serve CSX Transportation, Inc. (CSXT) freight rail. The newly built western tracks will cater mainly to passenger services provided by the Commonwealth's state-supported Amtrak Virginia service, Amtrak's long distance service, and Virginia Railway Express (VRE).

The FlatironDragados-Skanka JV's work on the Long Bridge North Project includes replacing the existing two-track rail corridor with a four-track system, stretching from the southern limit near the shore of the Potomac River, through East Potomac Park, across the Washington Channel, and ultimately connecting to L'Enfant Interlocking.

Construction is set to begin in July 2025 and comes with an anticipated completion date of Q4 2030.

Attachments

  • Original document
  • Permalink

Disclaimer

ACS - Actividades de Construcción y Servicios SA published this content on July 07, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on July 07, 2025 at 14:23 UTC.