Revival Gold Inc. provided the latest drilling results from the 2025 drilling program at the Company's Mercur Gold Project ("Mercur") located in Utah. Drilling Highlights. Assay results have been received from an additional twenty drill holes with the following highlight intersections in near-surface oxide gold mineralization at Mercur: 1.0 g/T gold over 30.5 meters width at 25.9 meters downhole in MYR 25-165; 0.74 g/T gold over 38.1 meters width at 16.8 meters downhole in MYR25-164; and 0.9 g/T gold over 30.,5 meters width at 13.7 meters downhole in RM25-163.

Additionally, drilling has extended gold mineralization outside the known Mineral Resource1 north of the Rover area in holes RM25-155 and MYR 25-157 with: 1.0 g/T gold over 10.7 meters width at 59.4 meters downhole in MYR 15.2 meters width at 80.8 meters downhole in RM 25-155. Continued confirmation of gold occurrence, grade and leachability with 2025 Preliminary Economic Assessment ("PEA") estimates. Average vertical depth to start of mineralization is about 32 meters for holes released todate, reflecting the shallow nature of the Mercur mineralization.

Mercur Drilling Details. The 2025 drilling program at Mercur finished in December with 115 RC and core holes completed. 86 holes have been released to-date.

Data collected will support the Company's planned prefeasibility study, a major milestone on the path to restarting gold production at Mercur. Drilling results collected to-date at Mercur are generally consistent with the Inferred Mineral Resource and metallurgical models developed for the Mercur PEA. Full drill results are presented in Table 1 below.