GoldMining Inc. commenced an exploration-focused drill program on the Company's 100%-owned São Jorge Project in the Tapajós gold district, Pará State, Brazil. Systematic drilling to follow up on high-priority targets generated through 2025 exploration in close proximity to the existing São Jorge mineral resource. Two-rig, 8,000-metre drilling program currently underway, fully funded and actively turning on site.
Testing new zones of potential bedrock mineralization at high priority geochemical and geophysical targets. Targets include William South, located within 2 km of the Deposit with initial drill results highlighted by: 12 m at 2.38 grams per tonne gold from 13 m depth, including 1 m at 22 g/t Au (SJRC-048-25); 4 m at 1.11 g/t Au from 46 m depth (SJRC-049-25); 1 m at 1.23 g/t Au from 16 m depth (SJRC-047-25); Large untested Induced Polarity chargeability anomaly. Significant expansion of existing geophysical coverage with an ongoing IP survey covering 49 line-kilometres to the east of the Deposit.
Emerging and expanding mineral system defined by a 12 km by 7 km footprint of elevated surface geochemical anomalies surrounding the Deposit, highlighting the broader exploration potential of the Project.

















