NYSE & TSX: AEM
First Quarter 2026 Results
May 1, 2026
2
Strengthening Financial Position and Increasing Shareholder Returns
Returned ~$375 million directly to shareholders through dividends and the Normal Course Issuer Bid ("NCIB")
Targeting to return ~40% of annual free cash flow to shareholders*
Detour Lake
1
Record Financial Results Driven by Solid Operational Performance
Operations - performance in line with plan, production led by Detour Lake, Canadian Malartic and Fosterville
Record financial results -adjusted EBITDA and adjusted net income
Canadian Malartic
3
Building the
Foundations of Our Future Growth
Advancing construction, development and studies at 5 key value driver projects
Positive exploration results at key value driver projects
Proposed consolidation of the Central Lapland Greenstone Belt in Finland
Hope Bay
Q1 2026 Highlights - High-Quality, Consistent, Resilient Business
On Track to Achieve 2026 Gold Production
Q1 2026
825 koz2
Full Year
Production Guidance
3.3 - 3.5 Moz
Full Year Guidance
Total Cash Costs1 $1,020 - $1,120/ozAISC1 $1,400 - $1,550/oz
* Through the dividend and NCIB
1 These are non-GAAP measures, see Notes to Investors Regarding Certain Measures of Performance in this presentation
2 Gold production excludes gold ounces from La India and Creston Mascota which were produced from residual leaching, see Notes to Investors Regarding Certain Measures of Performance in the appendix
NYSE & TSX: AEM
Q1 2026 RESULTS 3
Financial Highlights - Continuing to Deliver Leverage to Higher Gold Prices
Q1 2026 | Q1 2025 | |
Realized Gold Price1 ($/oz) | $4,861 | $2,891 |
Gold Production2 (koz) | 825 | 874 |
Production Costs ($/oz) | $1,158 | $879 |
Total Cash Costs3,4 ($/oz) | $1,093 | $895 |
AISC3,4 ($/oz) | $1,483 | $1,175 |
(in millions) Net Income | $1,695 | $815 |
Adjusted Net Income3 | $1,706 | $770 |
Adjusted EBITDA3 | $3,011 | $1,590 |
Cash Provided by Operating Activities | $1,346 | $1,044 |
Capital Expenditures3,5 | $574 | $419 |
Free Cash Flow3 | $732 | $594 |
(basic shares outstanding) Net Income per share | $3.39 | $1.62 |
Adjusted Net Income per share3 | $3.41 | $1.53 |
Operating Cash Flow per share3 | $2.69 | $2.08 |
1,200
1,000
800
600
400
Gold Production and Total Cash Costs
Q24
2025
Q3 4
2025
Q4 4
2025
Q1 2026
Payable Gold Production (koz)3
Total Cash Costs ($/oz)
$5.00
$4.00
$3.00
$2.00
$1.00
$-
Per Share Results
$3.41
$2.70
$1.94
$2.16
Q1 2026 - Operating cash flow per share reflects $1.3B tax
Q2
2025
Q3
2025
Q4
2025
Q1
2026
payment related to
3
Adjusted Net Income per Share3
Operating Cash Flow per Share
1 Realized gold price is calculated as gold revenues from mining operations divided by the number of ounces sold
2 Gold production excludes gold ounces from La India and Creston Mascota which were produced from residual leaching, see Notes to Investors Regarding Certain Measures of Performance in the appendix
3 These are non-GAAP measures, see Notes to Investors Regarding Certain Measures of Performance in the appendix
4 Total cash costs per ounce for each quarter of 2025 have been restated using the Company's revised composition for periods commencing on or after January 1, 2026. Using the Company's composition of this measure for periods ending on or prior to December 31, 2025, total cash costs per ounce were $903, $933, $994 and $1,089 for Q1, Q2, Q3 and Q4 2025, respectively.
5 Includes capitalized exploration
2025 tax liability
NYSE & TSX: AEM
Q1 2026 RESULTS 4
Disciplined Approach to Capital AllocationShareholder Returns
Targeting to return 40% of annual free cash flow to shareholders Dividend
Q1 2026 Operating Cash Flow Allocation*
* Chart segments are indicative only
Dividends paid since 1983
Quarterly dividend of $0.45 per share Share Buyback
Total share repurchases of $150M in Q1 2026
Intention to renew the NCIB in May 2026 on substantially the same terms, with an increased internal purchase limit of $2B
Strengthening the Balance Sheet
Net cash1 position increased to ~$2.9B at the end of Q1 2026
Fitch Ratings upgraded the Company's long-term issuer default rating from BBB+ to A- in April 2026
Reinvestment in the Business
Investing in production growth at 5 key value driver projects
Dividend and Share Buyback
Strengthening the Balance Sheet
$1.3BSustaining
Capital
Reinvestment in the Business3
Cumulative returns to shareholders (1983 to Q1 2026):
~$6.0 billion2
Returned ~50% of free cash flow4 to shareholders in Q1 2026 through dividends and share buybacks
1 This is a non-GAAP measure, see Notes to Investors Regarding Certain Measures of Performance in the appendix
2 Calculated as $5.0B cumulative dividends declared since 1983 plus $944M cumulative shares repurchased under the NCIB since 2022
3 Includes growth capital and strategic investments
4 Free cash flow is calculated including the effect of changes in non-cash working capital balances; excluding the effect of changes in non-cash working capital balances equates to a return of ~23%
NYSE & TSX: AEM
Q1 2026 RESULTS 5
Operational Highlights - Quebec, Nunavut, Finland
Odyssey
Q1 2026 Results
Strong production led by Canadian Malartic and Meadowbank, partially offset by lower grades at LaRonde and lower mill throughput at Kittila
Production at Meliadine and Goldex in line with plan
First production achieved at East Gouldie via ramp, approximately three months ahead of schedule
Optimization Initiatives
Q1 2026
Region | Gold Prod. (koz) | Prod. Costs ($/oz) | TCC1 ($/oz) | Op. Margin1 ($M) |
Quebec | 277 | $931 | $998 | $1,066 |
Nunavut | 208 | $1,335 | $1,117 | $694 |
Finland | 49 | $1,401 | $1,313 | $184 |
Continued advancement of automation initiatives at LaRonde, testing hauling ore tonnes with autonomous trucks from level 317 to level 290 in the East mine
Management and operational teams from several sites visited Finland to exchange best practices and learnings from Kittila's productivity initiatives
1 "TCC" represents Total Cast Costs and "Op. Margin" represents Operating Margin; these are non-GAAP measures, see Notes to Investors Regarding Certain Measures of Performance in the appendix
NYSE & TSX: AEM
Q1 2026 RESULTS 6
Pipeline Projects - Building Foundations for Decades of Production
Canadian Malartic
Pathway to 1Moz Annual Producer
Advancing development and infrastructure at East Gouldie
First production via ramp achieved in Q1 2026
First production via shaft expected in Q2 2027
Exploration drilling yields positive results at Odyssey and Marban, extending mineralization envelope
Hope Bay
Potential 400koz Annual Producer in Nunavut
Upgrading existing infrastructure and advancing site preparedness for potential redevelopment
Progressing technical evaluation, with detailed engineering expected to reach ~55% prior to potential construction decision in May 2026
Continued exploration success at Patch 7
NYSE & TSX: AEM
Q1 2026 RESULTS 7
Operational Highlights - Ontario, Australia, Mexico
Detour Lake
Q1 2026 Results
Strong production led by Detour Lake and Fosterville
Record quarterly tonnes extracted from open pit, combined with strong mill performance at Detour Lake
Record quarterly mill throughput at Macassa, despite challenges related to paste fill system
Solid underground performance at Fosterville resulting in additional development and ore tonnes mined
Q1 2026
Optimization Initiatives
Region | Gold Prod. (koz) | Prod. Costs ($/oz) | TCC1 ($/oz) | Op. Margin1 ($M) |
Ontario | 233 | $1,035 | $1,041 | $1,010 |
Australia | 41 | $1,098 | $1,123 | $135 |
Mexico2 | 18 | $3,746 | $2,311 | $56 |
Received permit to process AK ore from Macassa at LaRonde, unlocking incremental value through regional operating synergies
Continuing to advance LTE implementation at Macassa, supporting various optimization initiatives including the management operating system and tele-remote operation
1 "TCC" represents Total Cast Costs and "Op. Margin" represents Operating Margin; these are non-GAAP measures, see Notes to Investors Regarding Certain Measures of Performance in the appendix
2 Excludes gold ounces from La India and Creston Mascota which were produced from residual leaching, see Notes to Investors Regarding Certain Measures of Performance in the appendix
NYSE & TSX: AEM
Q1 2026 RESULTS 8
Pipeline Projects - Advancing Next Phase of Growth
Detour Lake
Pathway to 1Moz Annual Producer
Advancing exploration ramp and commenced overburden excavation of conveyor-ramp portal
Commenced high-intensity drilling program in west zone near the planned exploration ramp
Drilling further defined high-grade domains and west extension zone
Upper Beaver
Annual Producer with 200koz+ in Kirkland Lake Camp
Development of exploration ramp and exploration shaft continue to advance ahead of schedule
High-intensity drilling program targeting zone at 500-600m depth to complement bulk sample at the 760-metre level
San Nicolás
50% Joint Venture with Teck Resources
Cu-Zn-Ag-Au deposit located in Zacatecas, Mexico
MIA-R and ETJ permits completed, regulatory decision pending
Targeting 50% completion of engineering by mid-year 2026
NYSE & TSX: AEM
Q1 2026 RESULTS 9
Odyssey - Growing a World-Class Asset
East Gouldie deposit - Drilling continues to yield positive results in the upper eastern and deeper areas of the East Gouldie deposit
Odyssey North - Conversion drilling encountered significant mineralization in the lower portion of the porphyry in the internal zones
Highlights Intercepts
East Gouldie - 3.0 g/t gold over 14.7m at 999m depth East Gouldie - 6.7 g/t gold over 36.0m at 1,089m depth
Odyssey internal zone - 9.0 g/t gold over 53.5m (core length) at 1,067m depth
NYSE & TSX: AEM
Q1 2026 RESULTS 10
West Pit zone - Commenced high-intensity drilling program from surface to test the proposed underground bulk sample area near the planned exploration ramp, to validate the continuity of mineralization and improve the accuracy of the geological model
West Extension zone - Drilling continued to extend the underground mineral potential to the west
Highlights Intercepts
West Pit zone - 8.9 g/t gold over 14.1m at 187m depth
West Extension zone - 10.7 g/t gold over 10.1m at 497m depth West Extension zone - 2.6 g/t gold over 27.4m at 669m depth West Extension zone - 28.0 g/t gold over 4.4m at 734m depth
NYSE & TSX: AEM
Q1 2026 RESULTS 11
Creating a Multi-Decade, Multi-Asset Platform
Regional consolidation enhancing the Finland platform Unlocks significant value at Ikkari
Consolidates a highly prospective land package that will total approx. 2,492 km2 (including 279 km2 at Kittila)
Significant Exploration Upside
Consolidated land package has significant potential for
2
4 mineral resource expansion and new discoveries
1
3 Main areas of interest for an initial 3-year exploration program:
1▪ The Ikkari-Helmi gap area - from the property boundary between Rupert and the Fingold JV
2▪ The broader Ikkari trend
3▪ Aurion's Risti property and Fingold JV
4▪ The Area 51 target on Rupert's property, with targets analogous to Cu-Ni-PGE deposits nearby
NYSE & TSX: AEM
Q1 2026 RESULTS 12
Low-Risk Mining Jurisdictions
Highest Quality Senior Gold Producer
Strategic Regional Focus
Strong Financial Returns
Multi-mine, multi-decade geologic potential
Multi-decade political stability
Regional focus maintaining a manageable business
High sustainability standards with multi-decade investment horizon
Disciplined capital investments based on technical and regional knowledge
Creating value through the drill bit and technical expertise
High-quality project pipeline in core operating regions with unique potential to leverage existing assets
Competitive advantage from over 60 years of operations in Canada
Unique mining expertise in Nunavut
Emphasis on per share value creation
Strong financial position to fund growth projects, strengthen balance sheet and return capital to shareholders
43 consecutive years of dividend payments
NYSE & TSX: AEM
Q1 2026 RESULTS 13
AppendixAs at December 31, 2025 | As at December 31, 2024 | |||||
Category | Tonnes (000s) | Grade (g/t Au) | Contained Gold (000s oz) | Tonnes (000s) | Grade (g/t Au) | Contained Gold (000s oz) |
Mineral Reserves | ||||||
Proven | 212,796 | 0.98 | 6,731 | 215,249 | 0.93 | 6,433 |
Probable | 1,116,755 | 1.36 | 48,711 | 1,061,639 | 1.40 | 47,852 |
Total Proven & Probable | 1,329,551 | 1.30 | 55,442 | 1,276,888 | 1.32 | 54,284 |
Mineral Resources | ||||||
Measured | 113,254 | 1.28 | 4,656 | 111,028 | 1.23 | 4,397 |
Indicated | 1,086,470 | 1.21 | 42,420 | 1,056,019 | 1.14 | 38,553 |
Total Measured & Indicated | 1,199,724 | 1.22 | 47,076 | 1,167,047 | 1.14 | 42,950 |
Total Inferred | 522,289 | 2.49 | 41,815 | 451,483 | 2.49 | 36,208 |
* See AEM February 12, 2026 news release for further details on the mineral reserves and mineral resources as at December 31, 2025
NYSE & TSX: AEM
Q1 2026 RESULTS 15
Gold | Mining Method* | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | Metallurgical Recovery (%) |
LaRonde mine1 | U/G | 2,469 | 4.65 | 369 | 8,158 | 6.06 | 1,590 | 10,627 | 5.73 | 1,959 | 94.4 |
LaRonde Zone 52 | U/G | 6,405 | 2.02 | 415 | 6,800 | 2.17 | 474 | 13,205 | 2.09 | 889 | 94.5 |
LaRonde Total | 8,874 | 2.75 | 784 | 14,959 | 4.29 | 2,064 | 23,832 | 3.72 | 2,848 | ||
Canadian Malartic mine3 | O/P | 36,896 | 0.50 | 597 | 21,697 | 1.22 | 852 | 58,594 | 0.77 | 1,449 | 88.8 |
Marban deposit4 | - | - | - | 51,618 | 0.95 | 1,577 | 51,618 | 0.95 | 1,577 | 90.0 | |
Odyssey deposit5 | U/G | 29 | 2.37 | 2 | 4,758 | 2.12 | 325 | 4,787 | 2.12 | 327 | 95.0 |
East Gouldie6 | U/G | - | - | - | 54,943 | 3.23 | 5,699 | 54,943 | 3.23 | 5,699 | 94.4 |
Odyssey Mine Total | 29 | 2.37 | 2 | 59,701 | 3.14 | 6,024 | 59,730 | 3.14 | 6,026 | ||
Canadian Malartic Total | 36,925 | 0.50 | 599 | 133,016 | 1.98 | 8,453 | 169,941 | 1.66 | 9,052 | ||
Goldex7 | U/G | 6,255 | 1.48 | 298 | 9,065 | 1.68 | 488 | 15,320 | 1.60 | 786 | 85.9 |
Akasaba West8 | O/P | 969 | 0.82 | 26 | 2,807 | 0.96 | 86 | 3,777 | 0.92 | 112 | 77.6 |
Goldex Total | 7,225 | 1.39 | 324 | 11,872 | 1.51 | 575 | 19,097 | 1.46 | 898 | ||
Wasamac | U/G | - | 0.00 | - | 14,757 | 2.90 | 1,377 | 14,757 | 2.90 | 1,377 | 89.7 |
Quebec Total | 53,023 | 1.00 | 1,707 | 174,603 | 2.22 | 12,468 | 227,626 | 1.94 | 14,175 | ||
Detour Lake (At or above 0.5 g/t) | O/P | 66,690 | 1.08 | 2,313 | 434,448 | 0.90 | 12,641 | 501,138 | 0.93 | 14,954 | 88.4 |
Detour Lake (Below 0.5 g/t) | O/P | 53,681 | 0.42 | 722 | 243,242 | 0.37 | 2,899 | 296,923 | 0.38 | 3,621 | 88.4 |
Detour Lake Total9 | 120,371 | 0.78 | 3,035 | 677,690 | 0.71 | 15,540 | 798,061 | 0.72 | 18,575 | ||
Macassa10 | U/G | 612 | 10.43 | 205 | 6,013 | 8.68 | 1,678 | 6,625 | 8.84 | 1,883 | 95.9 |
Macassa Near Surface11 | U/G | 3 | 2.11 | - | 80 | 3.91 | 10 | 84 | 3.84 | 10 | 93.5 |
AK deposit12 | U/G | 126 | 4.35 | 18 | 1,975 | 4.54 | 288 | 2,101 | 4.53 | 306 | 93.5 |
Macassa Total | 742 | 9.36 | 223 | 8,068 | 7.62 | 1,976 | 8,810 | 7.77 | 2,200 | ||
Upper Beaver | O/P | - | - | - | 3,235 | 1.82 | 189 | 3,235 | 1.82 | 189 | 95.5 |
Upper Beaver | U/G | - | - | - | 19,946 | 4.02 | 2,579 | 19,946 | 4.02 | 2,579 | 95.5 |
Upper Beaver Total13 | - | - | - | 23,181 | 3.71 | 2,768 | 23,181 | 3.71 | 2,768 | ||
Hammond Reef14 | O/P | - | - | - | 123,473 | 0.84 | 3,323 | 123,473 | 0.84 | 3,323 | 89.8 |
Ontario Total | 121,113 | 0.84 | 3,258 | 832,412 | 0.88 | 23,607 | 953,524 | 0.88 | 26,865 | ||
Amaruq | O/P | 8,048 | 1.26 | 327 | 7,364 | 3.17 | 750 | 15,412 | 2.17 | 1,077 | 90.5 |
Amaruq | U/G | 81 | 4.22 | 11 | 2,221 | 5.12 | 366 | 2,302 | 5.09 | 377 | 90.5 |
Meadowbank Total15 | 8,129 | 1.29 | 338 | 9,585 | 3.62 | 1,116 | 17,714 | 2.55 | 1,454 | ||
Meliadine | O/P | 1,142 | 4.24 | 156 | 4,291 | 3.64 | 503 | 5,433 | 3.77 | 658 | 96.0 |
Meliadine | U/G | 2,962 | 6.32 | 602 | 13,680 | 5.37 | 2,362 | 16,642 | 5.54 | 2,964 | 96.0 |
Meliadine Total16 | 4,104 | 5.74 | 757 | 17,971 | 4.96 | 2,864 | 22,075 | 5.10 | 3,622 | ||
Hope Bay17 | U/G | 93 | 6.77 | 20 | 16,086 | 6.53 | 3,376 | 16,178 | 6.53 | 3,396 | 87.5 |
Nunavut Total | 12,325 | 2.82 | 1,116 | 43,642 | 5.24 | 7,356 | 55,967 | 4.71 | 8,472 | ||
Fosterville18 | U/G | 887 | 5.41 | 154 | 9,516 | 4.95 | 1,516 | 10,403 | 4.99 | 1,670 | 92.0 |
Australia Total | 887 | 5.41 | 154 | 9,516 | 4.95 | 1,516 | 10,403 | 4.99 | 1,670 | ||
Kittila19 | U/G | 931 | 4.66 | 140 | 23,818 | 4.15 | 3,179 | 24,749 | 4.17 | 3,319 | 86.0 |
Europe Total | 931 | 4.66 | 140 | 23,818 | 4.15 | 3,179 | 24,749 | 4.17 | 3,319 | ||
Pinos Altos | O/P | 26 | 1 | 1,629 | 1.00 | 53 | 1,656 | 1.00 | 53 | 93.6 | |
Pinos Altos | U/G | 633 | 2.06 | 42 | 2,374 | 2.29 | 175 | 3,007 | 2.24 | 216 | 94.2 |
Pinos Altos Total20 | 659 | 2.00 | 42 | 4,003 | 1.76 | 227 | 4,662 | 1.80 | 269 | ||
San Nicolás (50%)21 | O/P | 23,858 | 0.41 | 314 | 28,761 | 0.39 | 358 | 52,619 | 0.40 | 672 | 17.6 |
Mexico Total | 24,517 | 0.45 | 357 | 32,764 | 0.56 | 585 | 57,281 | 0.51 | 941 | ||
Total Gold | 212,796 | 0.98 | 6,731 | 1,116,755 | 1.36 | 48,711 | 1,329,551 | 1.30 | 55,442 |
Operation / Project
Proven
Mineral Reserves as at December 31, 2025
Probable
Proven & Probable
NYSE & TSX: AEM
Q1 2026 RESULTS 16
Mineral Reserves as at December 31, 2025 | |||||||||||
Operation / Project | Proven | Probable | Proven & Probable | ||||||||
Silver | Mining Method* | 000 Tonnes g/t | 000 Oz Ag | 000 Tonnes g/t | 000 Oz Ag | 000 Tonnes | g/t | 000 Oz Ag | Metallurgical | ||
Recovery (%) | |||||||||||
LaRonde mine Pinos Altos Pinos Altos Pinos Altos Total San Nicolás (50%) | U/G O/P U/G O/P | 2,469 10.46 | 830 | 8,158 20.75 | 5,443 | 10,627 | 18.36 | 6,273 | 78.1 | ||
26 8.57 | 7 | 1,629 34.82 | 1,824 | 1,656 | 34.40 | 1,831 | 44.5 | ||||
633 45.29 | 922 | 2,374 27.30 | 2,083 | 3,007 | 31.09 | 3,005 | 50.0 | ||||
659 43.81 | 929 | 4,003 30.36 | 3,907 | 4,662 | 32.26 | 4,836 | |||||
23,858 23.93 | 18,356 | 28,761 20.91 | 19,333 | 52,619 | 22.28 | 37,689 | 38.6 | ||||
Total Silver | 26,986 23.18 | 20,116 | 40,923 21.80 | 28,682 | 67,909 | 22.35 | 48,798 | ||||
Copper | Mining Method* | 000 Tonnes % | Tonnes Cu | 000 Tonnes % | Tonnes Cu | 000 Tonnes % Tonnes Cu Metallurgical | |||||
Recovery (%) | |||||||||||
LaRonde mine Akasaba West Upper Beaver Upper Beaver Upper Beaver Total San Nicolás (50%) | U/G O/P O/P U/G O/P | 2,469 0.17 | 4,081 | 8,158 0.30 | 24,751 | 10,627 | 0.27 | 28,831 | 82.8 | ||
969 0.48 | 4,640 | 2,807 0.53 | 14,810 | 3,777 | 0.51 | 19,451 | 79.0 | ||||
- - | - | 3,235 0.14 | 4,477 | 3,235 | 0.14 | 4,477 | 79.2 | ||||
- - | - | 19,946 0.25 | 50,453 | 19,946 | 0.25 | 50,453 | 79.2 | ||||
- - | - | 23,181 0.24 | 54,930 | 23,181 | 0.24 | 54,930 | |||||
23,858 1.26 | 299,809 | 28,761 1.01 | 291,721 | 52,619 | 1.12 | 591,530 | 78.2 | ||||
Total Copper | 27,296 1.13 | 308,530 | 62,908 0.61 | 386,213 | 90,204 | 0.77 | 694,743 | ||||
Zinc | Mining Method* | 000 Tonnes % | Tonnes Zn | 000 Tonnes % | Tonnes Zn | 000 Tonnes % Tonnes Zn Metallurgical | |||||
Recovery (%) | |||||||||||
LaRonde mine | U/G | 2,469 0.36 | 8,951 | 8,158 1.09 | 88,811 | 10,627 | 0.92 | 97,762 | 70.2 | ||
San Nicolás (50%) | O/P | 23,858 1.61 | 383,313 | 28,761 1.37 | 394,115 | 52,619 | 1.48 | 777,428 | 80.9 | ||
Total Zinc | 26,327 1.49 | 392,263 | 36,920 1.31 | 482,926 | 63,246 | 1.38 | 875,190 | ||||
*Open Pit ("O/P"), Underground ("U/G") 1 LaRonde mine: Net smelter value cut-off varies according to mining type and depth, not less than C$95/t for LP1 (Area 11-3) and not less than C$228/t for LaRonde. 2 LaRonde Zone 5: Gold cut-off grade varies according to stope size and depth, not less than 1.46 g/t. 3 Canadian Malartic: Gold cut-off grade is 0.35 g/t. 4 Marban deposit: Gold cut-off grade is 0.31 g/t. 5 Odyssey deposit: Gold cut-off grade varies according to mining zone and depth, not less than 1.44 g/t. 6 East Gouldie: Gold cut-off grade not less than 1.57 g/t. 7 Goldex: Gold cut-off grade varies according to mining type and depth, not less than 1.00 g/t. 8 Akasaba West: Net smelter value cut-off varies, not less than C$33.28/t. 9 Detour Lake: Gold cut-off grade is 0.27 g/t. 10 Macassa: Gold cut-off grade varies according to mining type, not less than 3.35 g/t for long hole method and 3.78 g/t for cut and fill method. 11 Macassa Near Surface deposit: Gold cut-off grade not less than 2.10 g/t. 12 Amalgamated Kirkland ("AK") deposit: Gold cut-off grade not less than 2.10 g/t. 13 Upper Beaver: Net smelter value cut-off varies according to mining type, not less than C$118.17/t for underground and C$43.49/t for open pit. 14 Hammond Reef: Gold cut-off grade is 0.41 g/t. 15 Amaruq: Gold cut-off grade varies according to mining type, not less than 0.98 g/t for open pit mineral reserves and 3.05 g/t for underground mineral reserves (gold cut-off grade for marginal underground mineral reserves from development is 1.17 g/t). 16 Meliadine: Gold cut-off grade varies according to mining type, not less than 1.50 g/t for open pit mineral reserves and 3.90 g/t for underground mineral reserves (gold cut-off grade for marginal underground mineral reserves from development is 1.50 g/t). 17 Hope Bay: Gold cut-off grade not less than 4.00 g/t. 18 Fosterville: Gold cut-off grade varies according to mining zone and type, not less than 3.00 g/t. 19 Kittila: Gold cut-off grade varies according to haulage distance, not less than 2.63 g/t. 20 Pinos Altos: Net smelter value cut-off varies according to mining zone and type, not less than C$25.44/t for open pit mineral reserves and US$85.97/t for the underground mineral reserves. 21 San Nicolás (50%): Net smelter return cut-off values for low zinc/copper ore of $9.71/t and for high zinc/copper ore of $13.15/t. | |||||||||||
NYSE & TSX: AEM
Q1 2026 RESULTS 17
NYSE & TSX: AEM
Q1 2026 RESULTS 18
Mineral Resources as at December 31, 2025 | |||||||||||||
Operation / Project | Measured | Indicated | Mesaured & Indicated | Inferred | |||||||||
Gold | Mining Method | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au |
LaRonde mine LaRonde Zone 5 LaRonde Total Canadian Malartic mine Marban deposit Marban deposit Marban regional Marban regional Odyssey deposit East Malartic East Gouldie Odyssey Mine Total Canadian Malartic Total Goldex Akasaba West Akasaba West Goldex Total Akasaba regional Wasamac | U/G | - | - | - | 6,457 | 3.59 | 746 | 6,457 | 3.59 | 746 | 1,366 | 6.03 | 265 |
U/G | - | - | - | 24,207 | 1.93 | 1,506 | 24,207 | 1.93 | 1,506 | 11,677 | 3.00 | 1,127 | |
- | - | - | 30,664 | 2.28 | 2,251 | 30,664 | 2.28 | 2,251 | 13,043 | 3.32 | 1,392 | ||
O/P | - | - | - | - | - | - | - | - | - | 5,011 | 0.73 | 118 | |
O/P | - | - | - | 3,875 | 0.51 | 63 | 3,875 | 0.51 | 63 | 2,956 | 0.66 | 63 | |
U/P | - | - | - | - | - | - | - | - | - | 4,544 | 2.14 | 313 | |
O/P | - | - | - | 14,794 | 1.22 | 582 | 14,794 | 1.22 | 582 | 11,272 | 1.08 | 390 | |
U/P | - | - | - | 296 | 3.36 | 32 | 296 | 3.36 | 32 | 183 | 3.37 | 20 | |
U/G | - | - | - | 4,493 | 1.63 | 236 | 4,493 | 1.63 | 236 | 20,176 | 2.23 | 1,445 | |
U/G | - | - | - | 48,216 | 1.92 | 2,976 | 48,216 | 1.92 | 2,976 | 63,275 | 1.89 | 3,835 | |
U/G | - | - | - | 5,048 | 1.42 | 230 | 5,048 | 1.42 | 230 | 94,278 | 2.43 | 7,372 | |
- | - | - | 57,757 | 1.85 | 3,442 | 57,757 | 1.85 | 3,442 | 177,729 | 2.21 | 12,652 | ||
- | - | - | 76,723 | 1.67 | 4,120 | 76,723 | 1.67 | 4,120 | 201,694 | 2.09 | 13,556 | ||
U/G | 12,360 | 1.86 | 739 | 21,245 | 1.45 | 988 | 33,604 | 1.60 | 1,727 | 17,951 | 1.46 | 842 | |
O/P | - | - | - | 130 | 0.38 | 2 | 130 | 0.38 | 2 | - | - | - | |
U/P | - | - | - | - | - | - | - | - | - | 966 | 1.60 | 50 | |
12,360 | 1.86 | 739 | 21,374 | 1.44 | 989 | 33,734 | 1.59 | 1,728 | 18,917 | 1.47 | 892 | ||
U/G | - | - | - | - | - | - | - | - | - | 3,052 | 3.24 | 318 | |
U/G | - | - | - | 9,479 | 2.19 | 667 | 9,479 | 2.19 | 667 | 3,911 | 2.48 | 312 | |
Quebec Total | 12,360 | 1.86 | 739 | 138,241 | 1.81 | 8,027 | 150,601 | 1.81 | 8,766 | 240,618 | 2.13 | 16,469 | |
Detour Lake | O/P | 35,300 | 1.16 | 1,312 | 587,007 | 0.66 | 12,373 | 622,307 | 0.68 | 13,685 | 51,442 | 1.38 | 2,290 |
Detour Lake | U/G | - | - | - | 52,924 | 2.04 | 3,472 | 52,924 | 2.04 | 3,472 | 59,549 | 2.03 | 3,878 |
Detour Lake Zone 58N | U/G | - | - | - | 2,868 | 5.80 | 534 | 2,868 | 5.80 | 534 | 973 | 4.35 | 136 |
Detour Lake Total | 35,300 | 1.16 | 1,312 | 642,798 | 0.79 | 16,379 | 678,098 | 0.81 | 17,691 | 111,964 | 1.75 | 6,304 | |
Macassa | U/G | 379 | 10.30 | 125 | 2,818 | 5.85 | 530 | 3,197 | 6.38 | 656 | 5,448 | 7.00 | 1,226 |
Macassa Near Surface | U/G | - | - | - | 59 | 4.02 | 8 | 59 | 4.02 | 8 | 309 | 3.99 | 40 |
AK deposit | U/G | - | - | - | 212 | 2.53 | 17 | 212 | 2.53 | 17 | 308 | 3.40 | 34 |
Macassa Total | 379 | 10.30 | 125 | 3,090 | 5.59 | 555 | 3,469 | 6.10 | 681 | 6,066 | 6.66 | 1,299 | |
Aquarius | O/P | - | - | - | 12,364 | 2.15 | 856 | 12,364 | 2.15 | 856 | 122 | 3.59 | 14 |
Holt complex | U/G | 5,806 | 4.29 | 800 | 5,884 | 4.75 | 898 | 11,690 | 4.52 | 1,699 | 9,097 | 4.48 | 1,310 |
Anoki-McBean | U/G | - | - | - | 3,919 | 2.77 | 349 | 3,919 | 2.77 | 349 | 867 | 3.84 | 107 |
Upper Beaver | O/P | - | - | - | 54 | 0.87 | 2 | 54 | 0.87 | 2 | - | - | - |
Upper Beaver | U/G | - | - | - | 7,510 | 2.04 | 493 | 7,510 | 2.04 | 493 | 2,953 | 4.12 | 391 |
Upper Beaver Total | - | - | - | 7,564 | 2.03 | 495 | 7,564 | 2.03 | 495 | 2,953 | 4.12 | 391 | |
Upper Canada | O/P | - | - | - | 1,477 | 1.66 | 79 | 1,477 | 1.66 | 79 | 1,408 | 1.47 | 66 |
Upper Canada | U/G | - | - | - | 9,546 | 2.40 | 738 | 9,546 | 2.40 | 738 | 22,736 | 2.93 | 2,145 |
Upper Canada Total | - | - | - | 11,024 | 2.30 | 817 | 11,024 | 2.30 | 817 | 24,143 | 2.85 | 2,211 | |
Hammond Reef | O/P | 47,063 | 0.54 | 819 | 86,304 | 0.53 | 1,478 | 133,367 | 0.54 | 2,298 | - | - | - |
Ontario Total | 88,548 | 1.07 | 3,057 | 772,946 | 0.88 | 21,829 | 861,494 | 0.90 | 24,885 | 155,212 | 2.33 | 11,636 | |
Mineral Resources as at December 31, 2025 | |||||||||||||
Operation / Project | Measured | Indicated | Mesaured & Indicated | Inferred | |||||||||
Gold | Mining Method | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au | 000 Tonnes | g/t | 000 Oz Au |
Amaruq | O/P | - | - | - | 2,488 | 3.03 | 242 | 2,488 | 3.03 | 242 | 190 | 2.87 | 18 |
Amaruq | U/G | - | - | - | 8,887 | 3.83 | 1,094 | 8,887 | 3.83 | 1,094 | 5,750 | 4.14 | 765 |
Meadowbank Total | - | - | - | 11,374 | 3.65 | 1,336 | 11,374 | 3.65 | 1,336 | 5,940 | 4.10 | 783 | |
Meliadine | O/P | 288 | 2.82 | 26 | 5,705 | 2.72 | 499 | 5,994 | 2.73 | 525 | 710 | 4.22 | 96 |
Meliadine | U/G | 1,662 | 3.80 | 203 | 12,928 | 3.65 | 1,515 | 14,590 | 3.66 | 1,719 | 14,036 | 5.28 | 2,382 |
Meliadine Total | 1,951 | 3.66 | 229 | 18,634 | 3.36 | 2,015 | 20,584 | 3.39 | 2,244 | 14,746 | 5.23 | 2,478 | |
Hope Bay | U/G | - | - | - | 14,946 | 4.61 | 2,217 | 14,946 | 4.61 | 2,217 | 16,868 | 5.98 | 3,246 |
Nunavut Total | 1,951 | 3.66 | 229 | 44,954 | 3.85 | 5,567 | 46,905 | 3.84 | 5,797 | 37,555 | 5.39 | 6,507 | |
Fosterville | O/P | 651 | 4.06 | 85 | 10,702 | 3.76 | 1,293 | 11,353 | 3.77 | 1,377 | 13,328 | 4.19 | 1,795 |
Fosterville | U/G | 337 | 3.72 | 40 | 16,203 | 1.41 | 732 | 16,539 | 1.45 | 772 | 13,255 | 1.75 | 745 |
Fosterville Total | - | - | - | 4,470 | 4.75 | 683 | 4,470 | 4.75 | 683 | 5,807 | 4.11 | 767 | |
Northern Territory | O/P | 337 | 3.72 | 40 | 20,672 | 2.13 | 1,415 | 21,009 | 2.15 | 1,455 | 19,062 | 2.47 | 1,512 |
Northern Territory | U/G | 987 | 3.94 | 125 | 31,374 | 2.68 | 2,707 | 32,362 | 2.72 | 2,832 | 32,391 | 3.18 | 3,307 |
Northern Territory Total | - | - | - | - | - | - | - | - | - | 373 | 3.89 | 47 | |
Australia Total | 4,669 | 2.87 | 431 | 17,874 | 2.81 | 1,617 | 22,544 | 2.83 | 2,048 | 6,209 | 4.66 | 930 | |
Kittila | O/P | 4,669 | 2.87 | 431 | 17,874 | 2.81 | 1,617 | 22,544 | 2.83 | 2,048 | 6,582 | 4.62 | 977 |
Kittila | U/G | - | - | - | 3,178 | 1.08 | 111 | 3,178 | 1.08 | 111 | 2,260 | 1.25 | 91 |
Kittila Total | - | - | - | 1,158 | 1.77 | 66 | 1,158 | 1.77 | 66 | 13,552 | 2.10 | 914 | |
Barsele (55%) | O/P | - | - | - | 4,335 | 1.27 | 176 | 4,335 | 1.27 | 176 | 15,811 | 1.98 | 1,005 |
Barsele (55%) | U/G | 4,669 | 2.87 | 431 | 22,210 | 2.51 | 1,794 | 26,879 | 2.57 | 2,224 | 22,393 | 2.75 | 1,982 |
Barsele (55%) Total1 | - | - | - | 2,488 | 3.03 | 242 | 2,488 | 3.03 | 242 | 190 | 2.87 | 18 | |
Europe Total | - | - | - | 8,887 | 3.83 | 1,094 | 8,887 | 3.83 | 1,094 | 5,750 | 4.14 | 765 | |
Pinos Altos | O/P | - | - | - | 1,530 | 0.90 | 44 | 1,530 | 0.90 | 44 | 154 | 0.57 | 3 |
Pinos Altos | U/G | - | - | - | 12,659 | 2.14 | 872 | 12,659 | 2.14 | 872 | 1,378 | 2.04 | 90 |
Pinos Altos Total | - | - | - | 14,189 | 2.01 | 916 | 14,189 | 2.01 | 916 | 1,533 | 1.89 | 93 | |
La India | O/P | 4,478 | 0.52 | 74 | 880 | 0.53 | 15 | 5,358 | 0.52 | 89 | - | - | - |
San Nicolás (50%) | O/P | 261 | 0.08 | 1 | 3,037 | 0.20 | 19 | 3,297 | 0.19 | 20 | 2,468 | 0.13 | 10 |
Tarachi | O/P | - | - | - | 19,290 | 0.58 | 361 | 19,290 | 0.58 | 361 | 242 | 0.52 | 4 |
Chipriona | O/P | - | - | - | 11,652 | 0.77 | 287 | 11,652 | 0.77 | 287 | 1,284 | 0.63 | 26 |
El Barqueño Gold | O/P | - | - | - | 8,431 | 1.24 | 335 | 8,431 | 1.24 | 335 | 9,696 | 1.12 | 349 |
Santa Gertrudis | O/P | - | - | - | 19,267 | 0.91 | 563 | 19,267 | 0.91 | 563 | 9,819 | 1.36 | 429 |
Santa Gertrudis | U/G | - | - | - | - | - | - | - | - | - | 9,079 | 3.44 | 1,004 |
Santa Gertrudis Total | - | - | - | 19,267 | 0.91 | 563 | 19,267 | 0.91 | 563 | 18,898 | 2.36 | 1,433 | |
Mexico Total | 4,739 | 0.49 | 75 | 76,746 | 1.01 | 2,496 | 81,485 | 0.98 | 2,571 | 34,120 | 1.75 | 1,915 | |
Total Gold | 113,254 | 1.28 | 4,656 | 1,086,470 | 1.21 | 42,420 | 1,199,724 | 1.22 | 47,076 | 522,289 | 2.49 | 41,815 | |
NYSE & TSX: AEM
Q1 2026 RESULTS 19
Mineral Resources as at December 31, 2025 | |||||||||||||
Operation / Project | Measured | Indicated | Mesaured & Indicated | Inferred | |||||||||
Silver | Mining Method | 000 Tonnes | g/t | 000 Oz Ag | 000 Tonnes | g/t | 000 Oz Ag | 000 Tonnes | g/t | 000 Oz Ag | 000 Tonnes | g/t | 000 Oz Ag |
LaRonde mine | U/G | - | - | - | 6,457 | 14.92 | 3,097 | 6,457 | 14.92 | 3,097 | 1,366 | 15.50 | 680 |
Pinos Altos | O/P | - | - | - | 1,530 | 20.28 | 997 | 1,530 | 20.28 | 997 | 154 | 13.90 | 69 |
Pinos Altos | U/G | - | - | - | 12,659 | 54.77 | 22,294 | 12,659 | 54.77 | 22,294 | 1,378 | 48.42 | 2,146 |
Pinos Altos Total | - | - | - | 14,189 | 51.05 | 23,291 | 14,189 | 51.05 | 23,291 | 1,533 | 44.95 | 2,215 | |
La India | O/P | 4,478 | 2.72 | 391 | 880 | 2.58 | 73 | 5,358 | 2.70 | 464 | - | - | - |
San Nicolás (50%) | O/P | 261 | 6.40 | 54 | 3,037 | 11.86 | 1,158 | 3,297 | 11.43 | 1,211 | 2,468 | 9.26 | 735 |
Chipriona | O/P | - | - | - | 11,652 | 100.69 | 37,722 | 11,652 | 100.69 | 37,722 | 1,284 | 76.97 | 3,176 |
El Barqueño Silver | O/P | - | - | - | - | - | - | - | - | - | 4,462 | 121.28 | 17,399 |
El Barqueño Gold | O/P | - | - | - | 8,431 | 5.15 | 1,396 | 8,431 | 5.15 | 1,396 | 9,696 | 16.00 | 4,989 |
Santa Gertrudis | O/P | - | - | - | 19,267 | 3.66 | 2,269 | 19,267 | 3.66 | 2,269 | 9,819 | 1.85 | 585 |
Santa Gertrudis | U/G | - | - | - | - | - | - | - | - | - | 9,079 | 23.31 | 6,803 |
Santa Gertrudis Total | - | - | - | 19,267 | 3.66 | 2,269 | 19,267 | 3.66 | 2,269 | 18,898 | 12.16 | 7,389 | |
Total Silver | 4,739 | 2.92 | 445 | 63,913 | 33.58 | 69,005 | 68,652 | 31.47 | 69,450 | 39,705 | 28.66 | 36,582 | |
Copper | Mining Method | 000 Tonnes % Tonnes Cu | 000 Tonnes % Tonnes Cu | 000 Tonnes % Tonnes Cu | 000 Tonnes % Tonnes Cu | ||||||||
LaRonde mine | U/G | - | - | - | 6,457 | 0.15 | 9,387 | 6,457 | 0.15 | 9,387 | 1,366 | 0.26 | 3,526 |
Akasaba West | O/P | - | - | - | 130 | 0.16 | 205 | 130 | 0.16 | 205 | - | - | - |
Akasaba West | U/P | - | - | - | - | - | - | - | - | - | 966 | 0.88 | 8,451 |
Akasaba West Total | - | - | - | 130 | 0.16 | 205 | 130 | 0.16 | 205 | 966 | 0.88 | 8,451 | |
Upper Beaver | O/P | - | - | - | 54 | 0.10 | 56 | 54 | 0.10 | 56 | - | - | - |
Upper Beaver | U/G | - | - | - | 7,510 | 0.16 | 12,063 | 7,510 | 0.16 | 12,063 | 2,953 | 0.36 | 10,649 |
Upper Beaver Total | - | - | - | 7,564 | 0.16 | 12,118 | 7,564 | 0.16 | 12,118 | 2,953 | 0.36 | 10,649 | |
San Nicolás (50%) | O/P | 261 | 1.35 | 3,526 | 3,037 | 1.17 | 35,489 | 3,297 | 1.18 | 39,015 | 2,468 | 0.94 | 23,144 |
Chipriona | O/P | - | - | - | 11,652 | 0.16 | 18,768 | 11,652 | 0.16 | 18,768 | 1,284 | 0.11 | 1,377 |
El Barqueño Gold | O/P | - | - | - | 8,431 | 0.21 | 17,650 | 8,431 | 0.21 | 17,650 | 9,696 | 0.22 | 21,555 |
El Barqueño Silver | O/P | - | - | - | - | - | - | - | - | - | 4,462 | 0.04 | 1,852 |
Total Copper | 261 | 1.35 | 3,526 | 37,270 | 0.25 | 93,617 | 37,531 | 0.26 | 97,143 | 23,193 | 0.30 | 70,555 | |
Zinc | Mining Method | 000 Tonnes % Tonnes Zn | 000 Tonnes % Tonnes Zn | 000 Tonnes % Tonnes Zn | 000 Tonnes % Tonnes Zn | ||||||||
LaRonde mine | U/G | - | - | - | 6,457 | 0.98 | 63,087 | 6,457 | 0.98 | 63,087 | 1,366 | 0.43 | 5,856 |
San Nicolás (50%) | O/P | 261 | 0.39 | 1,012 | 3,037 | 0.71 | 21,618 | 3,297 | 0.69 | 22,630 | 2,468 | 0.62 | 15,355 |
Chipriona | O/P | - | - | - | 11,652 | 0.87 | 101,211 | 11,652 | 0.87 | 101,211 | 1,284 | 0.72 | 9,178 |
Total Zinc | 261 | 0.39 | 1,012 | 21,146 | 0.88 | 185,916 | 21,407 | 0.87 | 186,928 | 5,117 | 0.59 | 30,389 | |
1 On January 28, 2026, Agnico Eagle entered into an agreement to sell its 55% interest in the Barsele project to Goldsky Resources Corp., with the closing of the transaction expected on or prior to June 30, 2026 (see AEM January 28, 2026 news release)
NYSE & TSX: AEM
Q1 2026 RESULTS 20
| Attention: This is an excerpt of the original content. To continue reading it, access the original document here. |
Attachments
- Original document
- Permalink
Disclaimer
Agnico-Eagle Mines Limited published this content on May 01, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 01, 2026 at 12:22 UTC.